16585-R 01/12/2017 A Backyard Products Company HILLSDALE GABLE 10' x 12' (305 x 366 cm) ACTUAL FLOOR SIZE IS 120 x 144" (304,8 x 365,8 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE OPTION 1: DOOR LOCATION LEFT SIDE OF EAVE WALL OPTION 2: DOOR LOCATION CENTERED ON EAVE WALL OPTION 3: DOOR LOCATION RIGHT SIDE OF EAVE WALL IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
TOOLS Required ❑ Phillips Optional ❑ Tool Belt/ ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades ❑ Drill / Driver ❑ 1/8" Drill Bit ❑ 1/4" Drill Bit ❑ 5/16" Drill Bit ❑ 1/2" Drill Bit ❑ #2 Philips Drive Bit ❑ Caulk Gun ❑ Tin Snips (for drip edge) ❑ Paint Tools ❑ Chalk Line ❑ Safety Glasses ❑ Hammer ❑ Nail Gun ❑ Level • gun nails ❑ Hand Saw ❑ Pencil ❑ Ladder ❑ Tape Measure ❑ Square ❑ Gloves or Safety! Always use approved safety glasses during assembly.
PARTS IDENTIFICATION AND SIZES Part identification letters are stamped on some parts. WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 2" x 4"..............1-1/2" x 3-1/2" (3,8 x 8,9 cm) RS 1" x 4".................3/4" x 3-1/2" (1,9 x 8,9 cm) RS 2" x 3"..............1-1/2" x 2-1/2" (3,8 x 6,3 cm) Check these locations for part stamp. 1" x 3".................3/4" x 2-1/2" (3,8 x 6,3 cm) PARTS LIST INVENTORY YOUR PARTS before you begin.
WINDOW & DOOR TRIM x6 AH x4 ROR 19/32 x 2-1/2 x 28-1/2" (1,5 x 6,3 x 72,4 cm) x4 AZ 19/32 x 2-1/2 x 30-1/8" (1,5 x 6,3 x 76,5 cm) x1 GEA x2 GPR x1 GPL x3 OO x2 LRA x2 ZJ 19/32 x 2-1/2 x 26-5/8" (1,5 x 6,3 x 67,6 cm) 19/32 x 2-1/2 x 39-3/8" (1,5 x 6,3 x 100 cm) 19/32 x 2-1/2 x 51" (1,5 x 6,3 x 129,5 cm) 19/32 x 2-1/2 x 51" (1,5 x 6,3 x 129,5 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) 1 x 4 x 69-3/4" (2,5 x 10,2 x 177,2 cm) 19/32 x 3 x 72" (3,2 x 7,6 x 182,9 cm) ROOF PANELS Roof pan
FASTENERS & HARDWARE FASTENER/HARDWARE BAG x92 1-1/2" (3,8 cm) x345 2" (5,1 cm) x150 3" (7,6 cm) x28 2" (5,0 cm) x58 1-5/8" (4,1 cm) x128 3/4" (1,9 cm) x12 1" (2,5 cm) x6 Boxes x4 Boxes 2" (5,1 cm) 3" (7,6 cm) VENT/ DOOR HARDWARE/ WINDOWS Window 22-1/4 x 29-3/4" (56,5 x 75,6 cm) T-Handle Spring Bolt x2 x1 x2 x1 x2 4-1/2" Shaft 5-1/2" Shaft x8 x4 1" (2,5 cm) (4 screws in each package) 1-1/2" (3,8 cm) (2 screws in each package) x8 3/4" (1,9 cm) Vent x2 x1 x1 64" Metal Thresh
ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed does not include any floor or leveling materials. Use our optional floor kit with building instructions and nails included. • See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. • If you choose to install your kit on a concrete slab refer to page 7. • If you choose to build your own wood floor foundation refer to page 8.
CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete.
BUILD YOUR OWN WOOD FLOOR OPTION (Materials not included.) 117" (297,2 cm) 144" (365,8 cm) E GL R SIN OO D 120" (304,8 cm) DO U DO BL OR E 16" (40,6 cm) 16" (40,6 cm) MATERIAL REQUIRED x2 2" x 4" x 12' (5,1 x 10,2 x 365,8 cm) MUST be treated lumber x10 2" x 4" x 10' (5,1 x 10,2 x 304,8 cm) MUST be treated lumber x3 4" x 4" x 12' (10,2 x 10,2 x 365,8 cm) x4 x1 x40 x60 MUST be treated lumber 5/8" x 48" x 96" (1,6 x 121,9 x 243,8 cm) 2" (5,1 cm) 3" (7,6 cm) 3" (7,6 cm) 1 lb.
OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 12' Kit) Runners are generally 12" (30,5 cm) from ends of floor frame and under seams. Measurements to centers of 4x4's. • 3" Screws angled into 4x4. • (2) at each point frame and 4x4 touch.
LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN 1 See page 9 for the preferred floor leveling method. 2 Use level and check the frame is level before applying floor panels. 3 Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square.
IMPORTANT! Check the floor frame is level after installing floor panels. Re-level if needed. • The floor should be used as a stable work surface for wall construction. HINT: • Organize your assembly procedure during the build process to avoid over-handling of the walls. EAVE SIDE WALL GABLE END WALL EAVE SIDE WALL EAVE SIDE WALL GABLE DOOR WALL (Your door location may vary.
RAFTER ASSEMBLY PARTS REQUIRED: x3 PVA x6 3" (7,6 cm) 2 x 4 x 5-7/8" (5,1 x 10,2 x 14,9 cm) It is very important to assemble your rafters using the following method for an even and flat roof. You will build a rafter jig using the floor and three PVA parts as shown. ¸1 BEGIN 2 Secure one PVA flush to the floor deck using two 3" screws. Measure over 120-3/4" and install a second PVA flush to the floor deck. PVA will overhang the floor. Secure using two 3" screws.
RAFTER ASSEMBLY PARTS REQUIRED: x10 x10 ¸1 x 10 1-5/8" (4,1 cm) OSB OR WOOD GRAIN x 118 2" (5,1 cm) 6 x 24" (15,2 x 61 cm) ECN 2 x 4 x 75-1/4" (5,1 x 10,2 x 191,1 cm) BEGIN 2 Place two rafters ECN into the jig as shown. Keep ECN firm against outside PVA's as shown (Fig.A) and push rafters tight to the middle PVA. Rafters should touch at tips (Fig. A). Apply glue to rafters where gusset will attach (Fig. B). Place gusset onto ECN holding a 1/4" gap from edge (Fig.
GABLE END WALL WITH DOORS PARTS REQUIRED: x3 x1 x6 CPA 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) 2 x 4 x 24-1/2" (5,1 x 10,2 x 62,2 cm) x2 KHA x42 3" (7,6 cm) x1 QS AM 2 x 4 x 32-1/2" (5,1 x 10,2 x 82,5 cm) 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) x1 TK 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) CGA 2 x 4 x 80-1/2" (5,1 x 10,2 x 204,5 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use two 3" nails at each mark. HINT: For easier nailing stand on frame.
GABLE END WALL WITH DOORS PARTS REQUIRED: x2 x1 x32 3" (7,6 cm) YFA 2 x 4 x 68-1/2" (5 x 10,2 x 174 cm) AM 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) 3 HINT: For easier nailing stand on frame. Orient parts on edge. Use two 3" nails at each location. AM YFA YFA Two nails at each location.
GABLE END WALL WITH DOORS PARTS REQUIRED: 48 x 84" (121,9 x 213,4 cm) x1 LEFT + 1 RIGHT x84 GAA 3/4" GAUGE BLOCK 4 Place left 48" x 84" panel onto wall frame flush to top of QS / CGA with primed side up as shown. Secure panel with two 2" nails 6" (15,2 cm) apart. 5 Repeat Step 4 to attach the right 48" x 84" panel. 48" (122 cm) 2" (5,1 cm) For squareness maintain flush along panel edges.
GABLE END WALL WITH DOORS PARTS REQUIRED: x2 x64 2" (5,1 cm) 11-7/8 x 84" (30,2 x 213,4 cm) 6 Place left 11-7/8" x 84" panel onto wall frame flush to top of QS / CGA with primed side up as shown. Secure panel with two 2" nails 6" (15,2 cm) apart. 7 Repeat Step 6 to attach the right 11-7/8" x 84" panel. 11-7/8" (30,2 cm) Flush Flush Primed side up Primed side up 6" (15,2 cm) Maintain Flush FINISH 8 Maintain Flush You have finished building your front door wall. Go to page 18.
STOP AS YOU FACE YOUR BUILDING, CHOOSE YOUR SINGLE DOOR (EAVE) LOCATION LEFT, CENTER OR RIGHT GABLE WALL DOUBLE DOORS GABLE WALL DOUBLE DOORS EAVE WALL OPTION 1: DOOR LOCATION LEFT SIDE OF EAVE WALL IF YOU CHOOSE TO LOCATE THE DOOR TOWARD THE LEFT GO TO Page 19 TO BEGIN BUILDING YOUR WALL . OPTION 2: DOOR LOCATION CENTERED ON EAVE WALL IF YOU CHOOSE TO LOCATE THE DOOR CENTERED GO TO Page 27 TO BEGIN BUILDING YOUR WALL .
EAVE SIDE WALL WITH DOOR LEFT PARTS REQUIRED: x3 x2 x1 x2 x8 x2 CPA AO QT SP TK TP x58 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 3" (7,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) HINT: For easier nailing stand on frame. BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use two 3" nails at each mark and four 3" nails at seams.
EAVE SIDE WALL WITH DOOR LEFT PARTS REQUIRED: x2 AO x1 QT x2 YFA x2 TK 3 x42 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 3" (7,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) HINT: For easier nailing stand on frame. Orient parts on edge on floor as shown. Measure and mark. Use two 3" nails at each mark and four 3" nails at seams.
EAVE SIDE WALL WITH DOOR LEFT PARTS REQUIRED: x68 GAA 2" (5,1 cm) x1 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Ensure your wall frame is square by installing one panel and squaring frame. 4 Place 48 x 84" panel onto wall frame flush to top of frame with primed side up as shown. Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A). 5 Move to the opposite end.
EAVE SIDE WALL WITH DOOR LEFT PARTS REQUIRED: x136 2" (5,1 cm) x2 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 7 For squareness maintain flush along panel edges. Place center 48" x 84" panel on frame as shown with primed side facing up. Flush Nail using 2" nails 6" apart on edges and 12" apart inside panel. 6" (15,2 cm) Primed side up 12" (30,5 cm) Flush 8 For squareness maintain flush along panel edges. Place end 48" x 84" panel on frame as shown with primed side facing up.
EAVE SIDE WALL WITH DOOR RIGHT PARTS REQUIRED: x3 x2 x1 x2 x8 x2 CPA AO QT SP TK TP x58 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 3" (7,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) HINT: For easier nailing stand on frame. BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use two 3" nails at each mark and four 3" nails at seams.
EAVE SIDE WALL WITH DOOR RIGHT PARTS REQUIRED: x2 AO x1 QT x2 YFA x2 TK 3 x42 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 3" (7,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) HINT: For easier nailing stand on frame. Orient parts on edge on floor as shown. Measure and mark. Use two 3" nails at each mark and four 3" nails at seams. Flush TK Two nails at each location.
EAVE SIDE WALL WITH DOOR RIGHT PARTS REQUIRED: x68 GAA 2" (5,1 cm) x1 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Ensure your wall frame is square by installing one panel and squaring frame. 4 Place 48 x 84" panel onto wall frame flush to top of frame with primed side up as shown. Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A). 5 Move to the opposite end.
EAVE SIDE WALL WITH DOOR RIGHT PARTS REQUIRED: x136 2" (5,1 cm) x2 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 7 For squareness maintain flush along panel edges. Place center 48" x 84" panel on frame as shown with primed side facing up. Flush Nail using 2" nails 6" apart on edges and 12" apart inside panel. 6" (15,2 cm) Primed side up 12" (30,5 cm) Flush 8 Place end 48" x 84" panel on frame as shown with primed side facing up. For squareness maintain flush along panel edges.
EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED: x3 x2 x1 x2 x8 x2 CPA AO QT SP TK TP x58 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 3" (7,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) HINT: For easier nailing stand on frame. BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use two 3" nails at each mark and four 3" nails at seams.
EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED: x2 AO x1 QT x2 YFA x2 TK 3 x42 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 3" (7,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) HINT: For easier nailing stand on frame. Orient parts on edge on floor as shown. Measure and mark. Use two 3" nails at each mark and four 3" nails at seams.
EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED: x68 GAA 2" (5,1 cm) x1 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Ensure your wall frame is square by installing one panel and squaring frame. 4 Place 48 x 84" panel onto wall frame flush to top of frame with primed side up as shown. Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A). 5 Move to the opposite end.
EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED: x136 x1 x1 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 7 2" (5,1 cm) 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) For squareness maintain flush along panel edges. Place center 48" x 84" panel on frame as shown with primed side facing up. Flush Nail using 2" nails 6" apart on edges and 12" apart inside panel. Primed side up Flush 6" (15,2 cm) 8 Place end 48" x 84" panel on frame as shown with primed side facing up.
EAVE SIDE WALL FRAME PARTS REQUIRED: x2 SP x7 TK x2 TP x32 3" (7,6 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN HINT: For easier nailing stand on frame. 1 Orient parts on edge on floor. Measure and mark.
EAVE SIDE WALL PANELS PARTS REQUIRED: x1 x45 48 x 84" (121,9 x 213,4 cm) 2" (5,1 cm) GAA 3/4" GAUGE BLOCK Ensure your wall frame is square by installing one panel and squaring frame. 3 Place 48 x 84" panel onto wall frame flush to top of frame with primed side up as shown. Use the gauge block to mark the 3/4" measurement on the wall stud. Secure panel with two 2" nails in the corners (Fig. A). 4 Move to the opposite end.
EAVE SIDE WALL PANELS PARTS REQUIRED: x90 2" (5,1 cm) GAA x2 3/4" GAUGE BLOCK 48 x 84" (121,9 x 213,4 cm) For squareness maintain flush and 3/4" measurement along panel edges. 6 Place center 48" x 84" panel on frame as shown with primed side facing up. Flush 3/4" (1,9 cm) Nail using 2" nails 6" apart on edges and 12" apart inside panel. 12" (30,5 cm) Primed side up 6" (15,2 cm) 3/4" GAUGE BLOCK 48" (121,9 cm) 7 Place end 48" x 84" panel on frame as shown with primed side facing up.
GABLE END WALL PARTS REQUIRED: x6 x2 x28 3" (7,6 cm) TK 2 x 4 x 80" (5 x 10,2 x 203,2 cm) YFA x2 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) STL 2 x 4 x 44-1/2" (5,1 x 10,2 x 113 cm) BEGIN 1 Orient parts on edge on floor. Measure and mark. 2 Use two 3" nails at each mark. 113" (287 cm) 68-1/2" (174 cm) HINT: For easier nailing stand on frame.
GABLE END WALL PARTS REQUIRED: x52 GAA 3/4" GAUGE BLOCK 48 x 84" (122 x 213,4 cm) x1 2" (5,1 cm) 3 Place 48" x 84" panel with primed side up onto frame flush at top and with a 3/4" gap on right side. Maintain 3/4" measurement along edge. 4 Secure panel to frame using 2" (5,1 cm) nails 6" (15,2 cm) apart along edges. Flush 3-1/2 (8,9 cm) 3/4" (1,9 cm) 12" (30,5 cm) BEGIN HERE For squareness maintain flush and 3/4" measurement along panel edges.
GABLE END WALL PARTS REQUIRED: x90 23-7/8 x 84" (60,6 x 213,4 cm) x1 2" (5,1 cm) 48 x 84" (122 x 213,4 cm) x1 5 Place 23-7/8" x 84" primed side up and flush with installed 48" x 84" panel edge. Ensure panel is flush at top. Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges. 6 Place 48" x 84" primed side up and flush with installed 23-7/8" x 84" panel edge. Ensure panel is flush at top. Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges and 12" (30,5 cm) apart on inside of panel.
EAVE WALL WITH SINGLE DOOR & WINDOW PARTS REQUIRED (TEMPORARY): x1 x14 OO x2 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) x22 3" (7,6 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Stand door & window eave wall on floor. 1 Center wall on the 144" (365,8 cm) floor dimension. 2 Use OO as a temporary brace. Secure with two 3" screws. (36 144 5, 8 " cm ) 3" (7,6 cm) Screws OO DOOR LOCATION MAY VARY 3 First, nail lower edge of panel to floor frame using 2" nails 6" apart. Angle nail to hit floor frame (Fig.
GABLE SOLID WALL PARTS REQUIRED: x18 x14 x1 1-1/2" (3,8 cm) 3" (7,6 cm) 2" (5,1 cm) x8 3" (7,6 cm) x2 IMPORTANT! Determine the gable end wall you want your double doors on now. Then, install this solid wall on opposite end. 2" (5,1 cm) Flush 2" (3,8 cm) Screw Flush Fig. A STEP 1 FIRST SCREW 2" (5,1 cm) Screw Flush BEGIN STEP 2 SECOND SCREW Stand wall on floor.
EAVE SOLID WALL PARTS REQUIRED: x25 2" (5,1 cm) x1 x2 x14 3" (7,6 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN Stand eave wall on floor. 1 Center eave solid wall on the 144" (365,8 cm) floor dimension. (36 144 5, 8 " cm ) 2 Secure top of wall using one 2" screw into top plate (Fig A). BE SURE TOP OF WALL FRAMES ARE FLUSH. 3" (7,6 cm) Screw Fig. C STEP 3 FIRST SCREW 3 4 Move to the bottom of gable end wall and secure bottom of wall using one 2" screw into eave wall bottom plate (Fig A).
EAVE SOLID WALL PARTS REQUIRED: x12 x25 3" (7,6 cm) 2" (5,1 cm) 6 Nail lower edge of eave wall panels to floor frame using 2" nails 6" apart. Angle nail to hit floor frame (Fig. D). 7 Secure eave wall bottom plates to floor using 3" nails (Fig. D). 3" (7,6 cm) Nails 6" (15,2 cm) Nail 2" nails first. 3" (7,6 cm) Nails 2" (5,1 cm) Nails Fig. D 8 Remove temporary brace. FINISH 9 You have finished standing your eave solid wall.
GABLE DOOR WALL PARTS REQUIRED: x14 x2 x4 2" (5,1 cm) x6 3" (7,6 cm) x28 3" (7,6 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) BEGIN Stand gable door wall on floor. It is important to secure the front wall in the following order: 1 Set gable door wall on floor and secure using one 2" screw on each side (Fig A). ENSURE TOP WALL FRAMES ARE FLUSH. Flush 2" (5,1 cm) Screw Flush Fig. A Flush Flush 2" (5,1 cm) Screw 2" (5,1 cm) Screw Flush Fig.
GABLE DOOR WALL PARTS REQUIRED: Nail lower edge of panels to floor using 2" nails 6" apart. Angle nail to hit floor frame (Fig. C). 3 2" (5,1 cm) Nails 6" (15,2 cm) Angle nail to hit floor frame. 6" (15,2 cm) Fig. C 3" (7,6 cm) Screw 4 Nail gable wall panels to eave wall studs using 1-1/2" nails 6" apart (Fig. E ). Fig. F 5 Secure gable door wall to floor using 3" nails (Fig. E).
GABLE PANELS PARTS REQUIRED: x2 RL x24 2 x 4 x 24" (5,1 x 10,2 x 61 cm) 1-1/2" (3,8 cm) x2 ECA 2 x 4 x 75-1/4" (5,1 x 10,2 x 191,1 cm) TEMPORARY SUPPORT x2 x2 x2 BEGIN 1 You will build TWO assemblies. Orient RL and ECA on flat as shown. 2 Place LEFT front gable panel as shown and secure using 1-1/2" nails. RL (on flat) ECA 1-1/2" (3,8 cm) Nails 1-3/4" (4,5 cm) 1-1/2" (3,8 cm) Primed side up 3 Place second RL as shown. Place MIDDLE front gable panel flush to installed left panel.
GABLE LADDERS PARTS REQUIRED: x64 3" (7,6 cm) x16 CLA 2 x 4 x 4-7/8" (5,1 x 10,2 x 12,4 cm) x8 ECA 2 x 4 x 75-1/4" (5,1 x 10,2 x 191,1 cm) BEGIN 1 Orient parts as shown (Fig. A). You will build FOUR assemblies (Fig. B). 2 Arrange, measure and mark locations of four CLA as shown place ECA on top. Secure using 3" screws as shown (Fig. A). Ensure parts are flush along edges. 47-1/4" (120 cm) Fig. A 23-1/4" (59,1 cm) 3" (7,6 cm) Screws Flush 3 x4 Fig.
GABLE ASSEMBLIES PARTS REQUIRED: x8 x4 PVA x2 Gable Assemblies 3" (7,6 cm) x36 2 x 4 x 5-7/8" (5,1 x 10,2 x 14,9 cm) x2 Ladder Assemblies 1-5/8" (4,1 cm) 7 Orient gable and ladder assemblies as shown (Fig. E). You will build TWO complete assemblies. 8 Ensure gable panels are flush at peak of ladder and flush along top edge of ladder assembly. Secure using 1-5/8" screws as shown (Fig. E). Fig.
GABLE UNITS PARTS REQUIRED: x8 3" (7,6 cm) x42 2" (5,1 cm) x2 Gable Units BEGIN Attach gable unit on front wall top plate. It is important to secure the gable unit in the following order: 1 Measure 1-1/2" down from top plate and mark at each side as shown. Set gable unit on top plate. Hold secure with one 2" nail on each side as shown. BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
RAFTERS PARTS REQUIRED: x5 ¸1 x30 3" (7,6 cm) Preassembled Rafter BEGIN Locate first rafter on top plate, aligned over studs at each side and tight to side wall (Fig. A, Fig B). Rest notch on top plate. 2 Secure rafter to top plate with one 3" screw from under top plate (Fig. B, C). 3 Continue securing rafter to top plate with two 3" screws above notch (Fig. B, C). 4 Place remaining rafters on top plate, aligned over studs as shown and secure with 3" screws (Fig. C).
ROOF PANELS PARTS REQUIRED: x230 x4 3/4" GAUGE BLOCK 7/16 x 27-1/4 x 32-5/8" (1,1 x 69,2 x 82,9 cm) x4 x2 x4 7/16 x 27-1/4 x 48" (1,1 x 69,2 x 121,9 cm) 2" (5,1 cm) 7/16 x 32-5/8 x 48" (1,1 x 82,9 x 121,9 cm) 7/16 x 48 x 96" (1,1 x 121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: all roof panels need to be installed with the rough side up (painted grid lines).
ROOF PANELS PARTS REQUIRED: 3 Attach another 27-1/4" x 32-5/8" roof panel flush to bottom of the installed 48"x 96" panel and flush with the rafter ends (Fig. B). Secure panel with two 2" (5,1 cm) nails in the corners. Two Nails Flush 27-1/4" x 32-5/8" Flush at rafter ends. 4 Flush Fig. B Nail the roof panels using 2" nails 6" apart on edges and 12" apart inside panel.
ROOF PANELS PARTS REQUIRED: 5 Two Nails Place 27-1/4" x 48" upper roof panels centered and flush to lower panel. 27 -1/ Ensure 3/4" measurement on the rafters (Fig. A). 4"x 48 " 27 Secure the lower edge of roof panels using two 2" nails in corners as shown. -1/ Flush 3/4" (1,9 cm) 4"x 48 " Flush Gauge Block Move up to the top of the panel and keep spacing between the center of the rafters (Fig. F). Secure panels with one 2" nail into each rafter. Fig.
ROOF PANELS PARTS REQUIRED: 8 Secure roof panels using 2" nails 6" apart on edges and 12" apart inside panel. 12" (30,5 cm) 9 6" (15,2 cm) Repeat STEPS 1 - 8 to attach roof panels on the opposite side. R O O D OR DO FINISH 10 You have finished installing your roof panels.
GABLE END SOFFITS PARTS REQUIRED: x72 2" (5,1 cm) x4 3/8 x 7-7/8 x 73-5/16" (1 x 20 x 186,2 cm) BEGIN 1 Ensure soffit boards are flush at seam (Fig. B) and flush at peak (Fig. D). Position right 73-5/16" overhang board Primed Side Down flush to front wall (Fig A) and gable panel seam (Fig B). Secure using twelve 2" finish nails. Fig. B Fig. A 8" (20,3 cm) Flush at center seam. 2" (5,1 cm) Finish Nails x12 per side Flush to wall.
EAVE SIDE SOFFITS PARTS REQUIRED: x32 2" (5,1 cm) x4 3/8 x 5-7/8 x 72-3/4" (1 x 14,9 x 184,8 cm) BEGIN 1 Ensure soffit boards are flush at rafter ends (Fig. B) and flush at seams. Position 72-3/4" soffit boards primed side down flush to gable soffits and rafter ends (Fig A). Toenail at center seam (Fig. C). Secure using eight 2" finish nails, two in each rafter. Fig. A Fig. B Flush Flush Fig.
GABLE FASCIA PARTS REQUIRED: x2 x2 3/8 x 4-3/4 x 75-7/8" (1 x 12,1 x 192,7 cm) 3/8 x 4-3/4 x 75-7/8" (1 x 12,1 x 192,7 cm) x32 Painted Red 2" (5,1 cm) Painted Green BEGIN 1 Position fascia with primed side out and flush to peak and roof panels as shown (Fig. A, Fig B). Secure using 2" finish nails spaced evenly as shown. 2 Repeat Step 1 on opposite side with other fascia. Flush Hint: Pre-set nails in fascia before final installation. Fig.A Flush at peak.
EAVE SIDE FASCIA PARTS REQUIRED: x4 x32 2" (5,1 cm) 3/8 x 4-3/4 x 80-5/8" (1 x 12,1 x 204,8 cm) BEGIN 1 Position two 4-3/4" x 80-5/8" fascia boards with primed side out, flush with roof panels and gable fascia as shown (Fig. A). Secure using 2" finish nails into rafter ends. 2 Repeat Step 1 on opposite eave. TOENAILING Flush at middle rafter. Flush Flush Primed Side Out 2" (5,1 cm) Finish Nails x8 per fascia board Flush with roof panel. Fig.
DOUBLE DOORS - GABLE WALL PARTS REQUIRED: IMPORTANT! USE DOORS WITH HINGE BOARD ENDS PAINTED GREEN AND RED HINT: Look for 3/8" SPACER attached to doors. x1 x1 x1 Left Door Right Door x4 x2 x1 GAA 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) OO 1 Orient parts as shown on flat surface. (right) and green (left) on hinge board. 2 Attach temporary support OO with 3" screws in middle and at ends as shown. Tighten securely. 3 Attach temporary support GAA with two 1-1/4" screws as shown. Tighten securely.
DOUBLE DOORS - GABLE WALL PARTS REQUIRED: x1 4 x13 OO 3" (7,6 cm) 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) Attach temporary support OO as a ledger board flush under wall panels for doors to rest on, using three 3" screws (Fig. A). OO Fig. A Flush against wall panels. OO 5 Center doors on panel seam as shown (Fig. B). Check ledger board is still flush under panels. 6 Screw hinge boards into wall supports and floor using ten 3" screws as shown. Make sure screws go into framing and floor (Fig.
DOUBLE DOORS - GABLE WALL PARTS REQUIRED: x1 x1 x1 3/4" (1,9 cm) x17 GPL Bagged seperately / special coating 19/32 x 2-1/2 x 51" (1,5 x 6,3 x 129,5 cm) x1 GPR 19/32 x 2-1/2 x 51" (1,5 x 6,3 x 129,5 cm) 64" Metal Threshold x4 ZJ 19/32 x 3 x 72" (1,5 x 7,6 x 183 cm) x5 2" (5,1 cm) x66 3/4" (1,9 cm) AH 19/32 x 3 x 26-5/8" (1,5 x 7,6 x 67,6 cm) BEGIN 1 Secure door trim from inside using 3/4" screws as shown (Fig. A).
DOUBLE DOOR STIFFENERS - GABLE WALL PARTS REQUIRED: x2 x12 2" (5,1 cm) OO 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) BEGIN 1 Center OO vertically on the left door in the door opening flush with the edge of door (Fig. A). 2 Secure using (6) 2" screws through outside trim into OO (Fig. B) 3 Repeat Steps 1-2 to install OO on right door. OO x2 FINISH 4 You have finished installing your door stiffeners. Fig. B IT IS IMPORTANT TO HOLD THESE DIMENSIONS Center OO in door opening. Fig.
DOUBLE DOOR HARDWARE PARTS REQUIRED: x2 x1 x1 1-1/2" (3,8 cm) 4-1/2" Shaft 1/4" (0,6 cm) 1/2" (1,3 cm) Drill Bits BEGIN 1 Measure and mark location of hole on outside of right door as shown (Fig.A). Pre-drill pilot hole with 1/4" dril. Pre-drill through hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of door stiffeners. TOP VIEW 1-1/2" (3,8 cm) 1/2" 1,3 cm 35-3/4" (90,8 cm) 1-1/2" 3,8 cm SIDE VIEW 2 Insert handle in hole and secure using 1-1/2" (3,8 cm) screws.
DOUBLE DOOR HARDWARE PARTS REQUIRED: 5/16" (0,8 cm) Drill Bit x2 x8 1" (2,5 cm) BEGIN 1 Place bolts onto OO in open position with bolt ends 3/8" (1 cm) down from frame. Bolt is open when loop is contacting base (Fig A). Mark and pre-drill holes for screws. 2 Install bolt with screws supplied and drill 5/16" (0,8 cm) hole deep enough for bolt to slide into. 3 Place bolts onto OO in open position with bolt ends 1/2" (1,3 cm) up from floor. Bolt is open when loop is contacting base (Fig B).
STOP CHOOSE YOUR SINGLE DOOR OPENING DIRECTION Right Hand (R.H.) or Left Hand (L.H.) RIGHT HAND DOOR IF YOU CHOOSE TO HAVE YOUR DOOR SWING OPEN TO THE RIGHT GO TO Page 63. LEFT HAND DOOR IF YOU CHOOSE TO HAVE YOUR DOOR SWING OPEN TO THE LEFT GO TO Page 67.
EAVE WALL R.H. DOOR PARTS REQUIRED: x5 UNIVERSAL DOOR Right 3" (7,6 cm) Painted Black on Ends x1 BEGIN Fig. A 1 Carefully cut bottom wall frame 2 x 4 flush with door frame using a saw (Fig. A). Be careful not to cut into floor panel! 2 Install door with black-painted hinge board. 3 Center door in wall panel opening. Hold door in position and keep level. 4 Measure Gap (Fig. B) between door trim and wall panel as shown. Hold door in position and keep level.
EAVE WALL R.H. DOOR - TRIM PARTS REQUIRED: x2 19/32 x 3 x 26-5/8" (1,5 x 7,6 x 67,6 cm) x1 x1 x33 AH 3/4" (1,9 cm) x9 2" (5,1 cm) GEA 19/32 x 3 x 39-3/8" (1,5 x 7,6 x 100 cm) x1 ZJ 19/32 x 3 x 72" (1,5 x 7,6 x 183 cm) GPR 19/32 x 2-1/2 x 51" (1,5 x 6,3 x 129,5 cm) BEGIN 1 Secure door trim from inside using 3/4" screws as shown (Fig. A). 2 Attach upper horizontal door rail AH with four 3/4" screws from inside of door.
EAVE WALL - R.H. DOOR STIFFENER/ THRESHOLD/ WEATHER STRIP PARTS REQUIRED: x1 x2 OO x6 3/4" (1,9 cm) x6 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) LRA Bagged seperately / special coating x1 1 x 4 x 69-3/4" (2,5 x 10,2 x 177,2 cm) x20 32" Metal Threshold 2" (5,1 cm) 2" (5,1 cm) BEGIN 1 Center OO vertically on door in the door opening (Fig. A) 1" from edge of door (Fig. B). 2 Secure using (6) 2" screws through outside trim into OO (Fig. B) Fig. A Center OO in door opening. Fig.
EAVE WALL R.H. DOOR HARDWARE PARTS REQUIRED: x2 1-1/2" (3,8 cm) x1 x1 5-1/2" Shaft 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN 1 Measure and mark location of hole on outside of right door as shown (Fig.A). Pre-drill pilot hole with 1/4" dril. Pre-drill through hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of door stiffener. Fig.
EAVE WALL L.H. DOOR PARTS REQUIRED: Painted Black on Ends x5 3" (7,6 cm) UNIVERSAL DOOR Left x1 BEGIN Fig. A 1 Carefully cut bottom wall frame 2 x 4 flush with door frame using a saw (Fig. A). Be careful not to cut into floor panel! 2 Install door with black-painted hinge board. 3 Center door in wall panel opening. Hold door in position and keep level. 4 Measure Gap (Fig. B) between door trim and wall panel as shown. Hold door in position and keep level.
EAVE WALL L.H. DOOR - TRIM PARTS REQUIRED: x2 x1 2" (5,1 cm) 3/4" (1,9 cm) 19/32 x 3 x 26-5/8" (1,5 x 7,6 x 67,6 cm) x1 x9 x33 AH GEA 19/32 x 3 x 39-3/8" (1,5 x 7,6 x 100 cm) x1 ZJ 19/32 x 3 x 72" (1,5 x 7,6 x 183 cm) GPR 19/32 x 2-1/2 x 51" (1,5 x 6,3 x 129,5 cm) BEGIN 1 Secure door trim from inside using 3/4" screws as shown (Fig. A). 2 Attach upper horizontal door rail AH with four 3/4" screws from inside of door.
EAVE WALL - L.H. DOOR STIFFENER/ THRESHOLD/ WEATHER STRIP PARTS REQUIRED: x1 OO 3/4" (1,9 cm) x6 Bagged seperately / special coating 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) x2 x6 x1 LRA 1 x 4 x 69-3/4" (2,5 x 10,2 x 177,2 cm) 2" (5,1 cm) x10 2" (5,1 cm) 32" Metal Threshold BEGIN 1 Center OO vertically on door in the door opening (Fig. A) 1" from edge of door (Fig. B). 2 Secure using (6) 2" screws through outside trim into OO (Fig. B) Fig. B Fig. A OO Center OO in door opening.
EAVE WALL L. H. - DOOR HARDWARE PARTS REQUIRED: x2 1-1/2" (3,8 cm) x1 x1 5-1/2" Shaft 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN 1 Measure and mark location of hole on outside of right door as shown (Fig.A). Pre-drill pilot hole with 1/4" dril. Pre-drill through hole with 1/2" drill. Keep drilled hole square to trim to avoid breaking edge of door stiffener. Fig.
CORNER TRIM PARTS REQUIRED: x4 x48 2" (5,1 cm) 3/8 x 1-3/4 x 82-1/2" (1 x 4,4 x 209,6 cm) x4 3/8 x 1-3/4 x 81-7/8" (1 x 4,4 x 208 cm) ¸1 BEGIN 2 Attach one 81-7/8" trim board flush under soffit panel and against eave wall (Fig. A, B) using one 2" finish nail at top as shown. Position 82-1/2" trim board flush along edge of 81-7/8" trim board and flush under gable panel (Fig. A, B). Secure using one 2" finish nail at top as shown. Finish attaching trim flush to corners (Fig.
COLLAR TIES PARTS REQUIRED: x2 x12 2" (5,1 cm) HJ 1 x 3 x 72" (2,5 x 7,6 x 182,9 cm) BEGIN 1 Position and level collar ties on 2nd rafters from front and back walls. HINT: For best appearance install collar ties on rafters facing away from door opening. 2 Attach with 2" nails as shown. HJ 2" (5,1 cm) Nails Flush Flush LEVEL r afte R 2nd GLUE GLUE r afte R 2nd HJ FINISH 3 You have finished installing your collar tie.
WINDOWS AND WINDOW TRIM PARTS REQUIRED: x8 x2 1-5/8" (4,1 cm) Window 22-1/4 x 29-3/4" (56,5 x 75,6 cm) 11-1/2" (29,2 cm) BEGIN 1 Mark center of window frame as shown. Measure over 11-1/2" and mark. Repeat step for other side. 2 Seal window with high-quality exteriorgrade caulk before installing (Fig. A). 3 Attach window using four 1-5/8" (4,1 cm) screws as shown. Ensure window is level. 4 Repeat Steps 1-3 to install other front window.
WINDOW TRIM PARTS REQUIRED: x4 x4 5 x32 ROR 2" (5 cm) 19/32 x 2-1/2 x 28-1/2" (1,5 x 6,3 x 72,4 cm) AZ 19/32 x 2-1/2 x 30" (1,5 x 6,3 x 76,2 cm) Place the inside edge of AZ 11-1/2" apart from the center of window as shown (Fig. B). Fig. B CENTER OF WINDOW 11-1/2" 11-1/2" (29,2 cm) (29,2 cm) Center trim vertically on window. Attach using 2" finish nails at locations shown. Nail into window frame and studs behind. CENTER OF WINDOW AZ 2" Finish Nails into wall frame AZ Fig.
GABLE VENTS PARTS REQUIRED: x8 #15021 x2 ¸1 #8 x 1" (2,5 cm) Pan Head Screws BEGIN Locate vent in the gable wall as shown. 2 Secure using 1" (2,5 cm) screws. 3 Repeat Steps 1-2 to install on the other gable wall. #8 x 1" (2,5 cm) Pan Head Screws FINISH 4 You have finished installing your vents.
PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: • Bottom edge of all siding and trim • Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting.
SHINGLES - NOT INCLUDED • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch SHINGLE NAIL PATTERN 1" (2,5 cm) 1/2" (1,3 cm) Notch Sealing Strip 1" (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. BEGIN 1 Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
SHINGLES continued... 2 2 Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF SHED 1" (2,5 cm) Notch BACK OF SHED Flush with starter row. - or - Drip Edge Flush with starter row. Notch 3 Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED 1" (2,5 cm) Notch Flush with rain slots.
SHINGLES continued... 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. Cut Off. 5" (12,7 cm) MAX. CUT Top of rain slot. 5" (12,7 cm) or less. • If more than 5" to rain slot you must install another row of shingles. 6 Repeat steps 1 - 5 to shingle the opposite side of your roof. Trim shingles at ridge.
SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN 1 Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" (5 cm) 2" (5 cm) 2" (5 cm) 2" (5 cm 2" (5 cm) 2" (5 cm) Score shingle, then snap-off angled cut. Weather Seal Top of slot. Note: • You will need about 30 - 32 cut pieces. 2 30 to 32 Pieces Install first ridge cap flush to shingles at front, as shown. (1) Nail per side through weather seal.
SHINGLES - RIDGE CAP continued... 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. 4" (10 cm) 6 Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Cap 7 Install flush to shingles. Flush to shingles (2) Nails per side. FINISH 8 You have finished your ridge cap.
WARRANTY REGISTRATION Please complete your warranty registration to properly validate your warranty. Register your product online at: www.OnlineWarranty.net. LIMITED CONDITIONAL WARRANTY* Backyard Storage Solutions, LLC warrants the following: 1. Every product is warranted from defects in workmanship and manufacturing for 1 year. 2. All accessories, hardware and metal components are warranted for 2 years. 3. All Oriented Strand Board (OSB) is warranted for 2 years 4.