Installation Instructions
RBS 884 Pico (1900 MHz) Radio Head Installation
Attaching Antenna Cables
5.
Warning!
Use care when handling the antenna connectors.
Connect the patch antenna cables from the external duplexer to the
press-fit connectors on each end of the patch antenna. See Figure 4-14
on page 4-32 for the location of the patch antenna cables.
8.3 Cable Installation and Power-Up
The RBS 884 Pico (1900 MHz) Radio Heads may be connected to Pico
CRI equipment using leased T1/E1 connections or non-leased proprietary
connections.
All T1 cable must be plenum rated, CAT5, 24-gauge UTP cable. E1 cable
may either be 75-ohm coaxial or 120-ohm twisted-pair cable. The maximum
cable length for propriety connection is 1,000 m
eters, without interconnects
or splices.
Preparations
1. Verify that the Control and Radio Interface (
CRI) has been installed.
If not, refer to Part 3 RBS 884 Pico (1900 MHz) CRI Installation in
this user’s guide.
2. Ensure that the following tools and materia
ls are available prior to
starting this installation procedure:
2/1531-AE/LZB 119 3834 Uae Rev PA6 2001-04-04 4-33