No. Image Spec Qty A M6 6 B M6 8 C M6 12 D M6 16 E St4.2 24 F Wrench 0.16"x0.
STEP 4 7 Connect All the Cables onto the Control Box(8) 10 AC Power port 8 Port for cable connected to the lifting column Port for hand switch 9 HS M1M2 M3 DC STEP 5 2 Install the Tabletop, Hand Switch(7) and Control Box (8) Loosen F E x21 4x4 8 7 The control box is to be installed on the tabletop underside 5 The expansion of the supporting beam can be adjusted according to the actual use.
STEP 6-A B x8 Install the Cable Management Tray (3) B 4 5 F 3 1 Way 1 Tighten Buckle in F 4x4 8 3 2 3 Buckle in the other side Attach screw (B) into the supporting beam (4) with AlIen key (F), do not tighten completely. Buckle one side of the cable management tray (3) into the screw (B), and then press the other side into the screw (B). Tighten screw (B) with Allen key (F). The cable management tray (3) on the auxiliary beam (5) is installed the same way.