Overall Size/CM: L190 x W190 x H195 Overall Size/inch: L75"x W75"x H77" 9820101-1 9820101-2 Do not tighten the steps in the greenhouse until completing on the assembly of the polycarbonate panels.
SAFETY ADVICE We strongly recommend the use of work gloves during assembly. Do not attempt to assemble the Aluminum greenhouse in windy or wet conditions, Do not touch overhead power cables with the aluminum profiles. Always wear shoes and safety goggles when working with extruded aluminum. Dispose of all plastic bags safely and keep them out of reach of children. The Aluminum greenhouse must be positioned and fixed on a flat level surface.
TOOLS & EQUIPMENT ADVISED Protective Equipment: 1.Helmet 2.Glove 3.Long Sleeve Cotton Overalls 4.Emergency Medicine Cabinet 5.Eye Shield Mesurement Tools: 1.Tape Measure (16.4Feet) 2.Angle Square 3.Level Meter Advised Installation Tools: 1.Triangle Stair 5 feet height 2.Spanner 10mm / (25/64) (Ratchet Wrench is better) 3.Spanner 14mm / (35/64) (Install the expansion screw) 4.Hexagon wrench 5mm (13/64) inch 5.Electric screwdriver + 5mm (13/64) inch hexagon wrench 6.Wooden Mallet 7.Marking Pen 8.
Parts List M5(13/64") M4(5/32") M4(5/32") 2 T5(13/64") T5(13/64") M5(13/64")
Do not fully-tighten screws
Door Preparation F1 Note: Lay the door frame on a flat surface. Make sure that door is square and even before tightening screws.
Window Preparation Note:Make sure that the window is flat and even before tightening all screws.
Screw Insertion Preparation Assemble the base 4-5-4-6 as shown on the next page Screw insertion preparation
Corner Posts Installation 1.Assemble upright 10R/10L for the bae panels. 2.Insert hex bolts in quantities shown.
Back Wall Assembly & Installation 1.Attach panels P3-P5-P3 to base with S2. 2.Attach rails 12-15-12 to panelsP3-P3-P3. 3.Attach panels P4R-P6-P4L to rails 12-15-12.
Front Frame Installation 1.Assembly upright 9-9 for door frame. 2.Insert hex bolts in quantities shown.
Front Wall Installation 1.Attach panels P3 to base with S2. 2.Insert hex bolts in quantities shown. 3.Attach rails 12-12 to panels P3 and P3. 4.Attach P4R,P4L,and P7 as shown. Install corner backs as shown. Do not fully tighten.
Side Beams Installation 1.Install crossbars 8-8, hand tighten only. 2.Insert hex bolts in quantities shown. Insert every rim 16 as shown. Hand tighten hex bolts only.
Roof Beam Installation Insert hex bolts in quantities shown. A.Install doorway corner braces where 13 and 16 meet using hex bolts. B.
Fastenings Installation
Screw Insertion Preparation 1.Assemble remaining uprights(19) 2.Insert hex bolts(F4)in quantities shown. Please insert 4 screws in the two 20 profiles beside the window and insert 3 screws in other 20 profiles.
Fastenings and Reinforcing Ribs Installation 15 1.Assemble the window base (B7-15) using bracket(B1). 2.Assemble corner brace to rails(17,20,26) as shown. 15 15 1.Assemble the six cross braces(22) and four cross braces(23) as shown using the pre-inserted hex bolt(F4).
Side and Roof Panels Installation 1.Insert six P8 panels into S2 at the base. 1.Insert all roof panels (P9,P10). 2.
Drain Profiles,Water Outlet and End Caps Assembly Finishing / Triming Insert two gutters (25) Using a water level or square to make sure that your greenhouse is straight and level. Tighten hex bolts at this time Install all end caps and trim.
Maintenance: 1.If the ground is not level, the unit may tilt to one side. If you find this is the case, please fix immediately to avoid damage. 2.Please prevent adding any increased weight to the product. 3.Avoid any vine/climbing plants, fruits, or vegetables from growing on the greenhouse as to not compromise the structure and durability of the product. If the structure is compromised, it can easily cause the frame to crack, break, or collapse. PC Panel Maintenance: 1.