Instructions / Assembly

www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
Parts List
ITEM QTY. PART # DESCRIPTION
1 4 1900 Corner Post, 4” x 4” x 19”
2 2 3102 Side Rail w/Cleat, 31” x 5-1/2” x 1”
3 2 3101 , 3101L Side Rail, (one w/Logo), 31” x 5-1/2” x 1”
4 2 3103 Narrow Center Side Rail, 31” x 2-1/2” x 1”
5 4 1450 Side Rail, 14-1/2” x 5-1/2” x 1”
6 2 1451 Narrow Center Side Rail, 14-1/2” x 2-1/2” x 1”
7 4 1550 Bottom Board, 15” x 5-1/2” x 1”
8 2 1552 Corner Notched Bottom Board, 15” x 5-1/2” x 1”
9 4 3100 Post Cap, 4” x 4” x 1-1/2”
10 1 2002 Fabric Liner, 22” x 36”
Planter Box (18” x 34”)
Assembly Instruction
1
Parts Identi cation
Stack matching pieces in piles. Using the parts list, locate
and count the individual pieces and verify that you have
received the correct number of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: It is recommended to place a protective layer
between the ground and the pieces during assembly. This
will help prevent damage to the pieces.
PB 18-34
PB 18-34S
1
2
3
4
5
6
7
8
10
10
9
Side Rail Assembly
2
Stand two 4” x 4” x 19” corner posts (Item 1) upright with slots facing each post
and slots facing you.
Locate a 31” x 5-1/2” side rail w/cleat (Item 2). With cleat located at the bottom
and facing you, install side rail w/cleat into the slots and slide down to the bottom
of the slots.
Repeat procedure for the two remaining 4” x 4” x 19” corner posts and 31” x 5-1/2”
side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth
of approximately 10”. Reverse side rail w/cleat installation, cleats
located at top, if a soil depth of approximately 6” is desired).
Cleat
2
1
1
Packaged & Inspected by: Date:

Summary of content (2 pages)