Instruction Manual
Great Plains Mfg., Inc.
Installation Instructions 5
05/05/2009 401-466M
Refer to Figure 9, which is a view back, left and up into the seed cart
frame (with the airbox deleted for clarity)
28. Select one:
411-271D BULKHEAD HOSE MNT
29. Place the bulkhead keyholes over the rear
two loose nuts, and press it flush against the seed
cart frame .
30. Slide the bulkhead forward until all three narrow
openings are under the nuts and washers .
Tighten nuts.
Assemble and Route Auxiliary Hoses
Refer to Figure 10
31. Select two of each, per YP model:
YP1225:
811-204C CP 3/4FORB QD BH
841-365C HH3/8R2 300 9/16FJIC 3/4MORB
YP1625:
811-204C CP 3/4FORB QD BH
811-960C HH3/8R2 360 9/16FJIC 3/4MORB
32. Insert the male O-ring Boss (MORB) end of the
hydraulic hose ( or ) into the female O-Ring
boss (FORB) end of the coupler . Tighten.
Refer to Figure 11
33. Route the hose ends with the couplers into the left
side of the seed box frame, from above the seed
tube rack. They will be tie-wrapped to the left seed
tube bundle at step 65. Align them with that in
mind.
Figure 9
Install Bulkhead
25402
44
41
20
3
13
1
1
U
D
B
F
L
R
26
13
13 1
3
13
41 44
Figure 10
Assemble Port Hoses
25403
31
32
34
32
31
32
34
31 34
32
Figure 11
Route Hoses into Seed Frame
25404