™ playsets ™ s playset Cadence Model: 1900 (BOXES: 1900-1, 1900-2, & SLIDE BOX) Copyright © 2014 Gorilla Playsets All Rights Reserved 190 Etowah Industrial Court Canton, GA 30114 www.gorillaplaysets.
Please inspect and inventory all parts immediately upon accepting delivery. Use the inventory pages in the manual to make sure you have received all necessary parts. The quickest method to get any parts that are missing or damaged is to use our “Quick Response Center” located at: www.gorillaplaysets.com/support DO NOT RETURN THIS PRODUCT TO THE RETAILER OR CONTACT THE RETAILER DIRECTLY. THE RETAILER DOES NOT STOCK COMPONENTS. PLEASE RETAIN ALL INSTRUCTIONS FOR FUTURE REFERENCE.
GORILLA PLAYSETS WARRANTY – 2014 Gorilla Playsets® (“Gorilla”) warrants its play sets to be free from defects in workmanship and materials, under normal use and conditions, for 10 years for above ground structural wood components and for one year for all other components (e.g., swings, hardware, plastics, tarps, rope ladder, etc.).
IMPORTANT SAFETY GUIDELINES This product is recommended for use by children ages 3-11. This product is intended for residential use only and not intended for use in any public setting. A safety surface such as mulch or recycled tire should be used under the play set to prevent injury from falls. Also a 6 foot safety zone should be used around the entire play set. As with any home project, good judgment and respect for power tools will greatly reduce the risk of injury.
WARRANTY REGISTRATION - CADENCE Gorilla Playsets manufactures the finest quality products that are designed for outstanding strength and durability. We back our products with an unparalleled warranty. In the unlikely event that you will need to contact us about covered repairs, we must have a valid Warranty Registration on file.
IMPORTANT – PLEASE READ As fresh lumber acclimates to its new environment, the natural tendencies of the tree can show itself in the form of checks, or “cracks” in the lumber. In almost all cases this is normal and it will not affect the structural integrity of your play set.
Model: 1900 (BOXES: 1900-1, 1900-2, & SLIDE BOX) REV: 3.13.
TABLE OF CONTENTS Safety Guidelines……………………………………….......……...........................Pages 3-6 Leveling Fort, General Information and Definitions............................................Pages 6-8 How to Install T-Nuts, Board Identification, Predrill Lag Screw Directions and Swing Beam Loading…………………..............................................................Pages 9-13 Site Plan, Required Tool List and Kit Contents………………………………....Pages 14-15 Hardware, Lumber and Accessory Checklists...................
Safety and Maintenance Tips for Your New Play Set: NOTE: Your children’s safety is our #1 concern. Observing the following statements and warnings reduces the likelihood of serious or fatal injury. Please review these safety rules regularly with your children.
Safety and Maintenance Tips for Your New Play Set: (continued) Playgrounds should be inspected on a regular basis. If any of the following conditions are noted, they should be removed, corrected, or repaired immediately to prevent injuries. • Hardware that is loose, worn or that has protrusions or projections. • Exposed equipment footings. • Scattered debris, litter, rocks, or tree roots. • Splinters, large cracks, and decayed wood components.
Play Set Surfacing Recommendations: Below are some of the recommendations that the U.S. Consumer Product Safety Commission (CPSC) offers from its Handbook for Public Playground Safety. The guide can be downloaded in full at www.cpsc.gov/cpscpub/pubs/325.pdf 1. Protective Surfacing - Since almost 60% of all injuries are caused by falls to the ground, protective surfacing under and around all playground equipment is the most critical safety factor on playgrounds.
2. Fall Zones - A fall zone, covered with a protective surfacing material, is essential under and around equipment where a child might fall. This area should be free of other equipment and obstacles onto which a child might fall. Stationary climbing equipment and slides should have a fall zone extending a Minimum of 6’ in all directions from the perimeter of the equipment. Swings should have a fall zone extending a minimum of 6’ from the outer edge of the support structure on each side.
General Info to Review Before Installation • Depending on your experience, assembly of the playset can take as little as 6 hours up to 24 hours, depending on size, after inventory of parts; therefore, we recommend you set aside a full two days for assembly. • Identify all of the parts for your play set. Empty each box and lay out boards so you can see each part. Your instruction book will have detailed drawings that will make it easy for you to recognize individual parts.
This page is a list of definitions and explanations used throughout our instructions to aid you in the assembly of your play set. Offset Holes- Throughout the installation procedures we will refer to parts with offset holes. This refers to the orientation of the holes on the board. An offset hole is one that is closer to one side than it is the other or in other words, it is not centered on the board.
Common Installation Practice Installing T-nuts When installing T-nuts into the wood, use a smooth faced hammer to set the face of the T-nut flush into the wood. Corner Post T-nut This picture shows the T-nut inserted and installed flush to the wood. Flush (Correct) Insert the barrel of the T-nut into the predrilled hole. Using a smooth faced hammer, drive the T-nut until the face of the T-nut is flush to the wood. This picture shows an end view of the T-nut installed flush to the wood.
HOW A T-NUT WORKS THE FIRST STEP IN OUR ASSEMBLY INSTRUCTIONS IS TO INSERT T-NUTS INTO THE CORNER POSTS. A T-NUT IS A FASTENER WHICH IS THREADED ON THE INSIDE AND IT FUNCTIONS JUST LIKE A STANDARD HEX NUT. YOU INSERT THE T-NUTS INTO THE PREDRILLED HOLES IN THE CORNER POSTS. THE T-NUT HAS A BARREL SHAPED END WHICH GOES INTO THE HOLE IN THE CORNER POST. THE T-NUT ALSO HAS AN FLANGE SHAPED END WITH TEETH.
BOARD IDENTIFICATION 1. On the end of each board there should be a small white tag that is stapled into place. 2. This white identifcation tag displays the thickness, width, length and an abbreviated description of the part. Example: a tag reads "2-4-3600-BPB" • The 2 is the thickness of the board. "Nominal Lumber" at a home center will measure 11/2" for the thickness. We "remill" that lumber to 1-3/8" thick. • The 4 is the width of the board.
PRE-DRILL LAG SCREW DIRECTIONS Pre-drilling holes for lag screws will make it easier to drive the screws in by hand. "Jobber" length drill bits are available in sizes that are longer than standard drill bits and those are ideal for the job. When using the drill bit you will have to "spot" drill the post and then remove the board you are attaching to finish drilling the hole. Pay attention to the DIAMETER of the lag screw you are installing. Your playset may come with two different diameter lag screws.
SWING BEAM LOADING Weight Limits for Accessories: The weight limit for a Swing Belt is 225 lbs. (Although 150lbs is the maximum recommended swinging weight capacity for the swing position.) The weight limit for a Trapeze Bar is 125 lbs. Maximum Allowable swinging weight for a three position swing: 1) The maximum allowable swinging weight at each Swing Belt position is 150 lbs. 2) The maximum allowable swinging weight at the Trapeze position is 125 lbs. 3) The MAXIMUM SWING BEAM LOAD IS 425 lbs.
familiarize yourself themanual. manual, parts/components and general 1900 Please Cadence/Overture Overhead withwith Dims for construction process of your new playset before getting started.
REQUIRED TOOL LIST: ___ Standard or Cordless Drill w/ Phillips Bit (#2 square bit provided) ___ Drill Bits 1/8”, 3/8”, 9/64”, 11/64” ___ ½” Wrench and Socket ___ ½” Deep Well Socket ___ 9/16” Deep Well Socket ___ 9/16” Wrench and Socket ___ Level ___ Tape Measure ___ Extension Cord (if using standard drill) ___ Hammer ___ Pencil ___ Locking Pliers (Vise Grips) ___ Shovel KIT CONTENTS Swings, Slides, Accessories: ___ (Qty ) Description ___ (1) 8ft.
11-0059 1900 Hardware REV: B 11/22/2013 JH Page 1 of 2 9 8 #14 X 1-1/4" PAN HEAD SCREW QTY: 10 7 6 5 5/16" X 5/8"L TEE NUT QTY: 66 4 3 TORQUE WASHER QTY: 14 #2 SQUARE DRIVE BIT QTY: 1 2 1 3/8 x 7" CARRIAGE BOLT QTY: 13 3/8 x 6-1/2" CARRIAGE BOLT QTY: 1 5/16" PLASTIC BOLT CAP QTY: 7 3/8" PLASTIC BOLT CAP QTY: 14 USE THE RULER TO THE RIGHT TO MEASURE YOUR BOLTS AND SCREWS. PICTURE VIEWS SHOWN ABOVE ARE 1:1 SCALE AND CAN BE USED TO MATCH BOLT AND SCREW SIZES.
11-0059 1900 Hardware REV: B 11/22/2013 JH Page 2 of 2 #8 X 1-1/4" WOOD SCREW QTY: 4 #8 X 1-3/4" WOOD SCREW QTY: 4 9 #8 X 2" WOOD SCREW QTY: 190 3/8" LOCK NUT QTY: 14 8 #8 X 2-1/2" WOOD SCREW QTY: 53 7 #8 X 3" WOOD SCREW QTY: 14 5/16" LOCK NUT QTY: 7 6 5 1/4" WASHER QTY: 10 5/16" WASHER QTY: 82 3/8" WASHER QTY: 14 4 3 2 1 5/16 X 4-1/2" HEX BOLT QTY: 22 5/16" X 3-1/2" HEX BOLT QTY: 2 5/16" X 2-1/2" HEX BOLT QTY: 40 5/16 X 1-1/2" HEX BOLT QTY: 8 5/16" X 1" HEX BOLT QTY: 1 USE THE RULER TO
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION 2 X 4 X 94" SWING LEG CROSS MEMBER QTY.
PICTURE DESCRIPTION QTY.
PICTURE DESCRIPTION 4 X 6 X 96" SWING BEAM 4-6-9600-SB QTY.
PICTURE DESCRIPTION WAVE SLIDE 03-0010 SWING BELT W/CHAINS QTY.
PICTURE 1900 HARDWARE KIT (NOT SHOWN) DESCRIPTION 1900 HARDWARE QTY.
PICTURE DESCRIPTION SWING LEG ANGLE BRACKET QTY.
STEP 1: INSTALLING T-NUTS (RIGHT FRONT CORNER POST) 1: Locate one 2 x 4 x 84” Corner Post (Right Side) The top will have four holes. 2: Use a hammer to set t-nuts after inserting them into the holes shown in the diagram. 3: The barrel of the t-nut should go in the hole first. Hammer the t-nut until it is flush/almost flush to the corner post. Four holes in top of the Corner Post on this face.
STEP 2: INSTALLING T-NUTS (RIGHT REAR CORNER POST) 1: Locate one 2 x 4 x 84” Corner Post (Right Side). The top will have four holes. 2: Use a hammer to set t-nuts after inserting them into the holes shown in the diagram. 3: The barrel of the t-nut should go in the hole first. Hammer the t-nut until it is flush/almost flush to the corner post. Four holes in top of the Corner Post on this face.
STEP 3: INSTALLING T-NUTS (LEFT FRONT CORNER POST) 1: Locate one 2 x 4 x 84” Corner Post (Left Side). The top will have three holes. 2: Use a hammer to set t-nuts after inserting them into the holes shown in the diagram. 3: The barrel of the t-nut should go in the hole first. Hammer the t-nut until it is flush/almost flush to the corner post. Three holes in top of the Corner Post on this face.
STEP 4: INSTALLING T-NUTS (LEFT REAR CORNER POST) 1: Locate one 2 x 4 x 84” Corner Post (Left Side). The top will have three holes. 2: Use a hammer to set t-nuts after inserting them into the holes shown in the diagram. 3: The barrel of the t-nut should go in the hole first. Hammer the t-nut until it is flush/almost flush to the corner post. Three holes in top of the Corner Post on this face.
STEP 5: RIGHT SIDE FRAME ASSEMBLY (OUTSIDE FACE) 1: Place the Right Front and Right Rear corner posts as shown below. The flange of the T-nuts should be on the INSIDE of the corner posts facing each other at the top, middle and bottom. 2: The flange of the T-nuts should be on the BACK side of the corner posts where a board is attached. 3: Attach each board to the corner posts with 5/16” x 2-1/2” hex bolts and 5/16” washers.
STEP 6: RIGHT SIDE FRAME ASSEMBLY (INSIDE FACE) 1: The Right Side Frame Assembly should still be turned over from putting in four T-Nuts in the previous step. If the frame is not turned over then turn it over now. 2: The flange of the T-nuts should be on the BACK side of the corner posts where the board is attached. 3: Attach the 2 x 4 x 47-3/8” Deck Support to the corner posts with 5/16” x 2-1/2” hex bolts and 5/16” washers.
STEP 7: ROCK WALL 1: Find two 2 x 4 x 50-1/2" Rock Wall Sides. 2: Position the Rock Wall Sides so that the holes in the boards are facing the same way. 3: Insert T-Nuts into the INSIDE of the Rock Wall Sides and set with a hammer.
STEP 8: ROCK WALL 1: Find ten 5/4 X 3 X 23-7/8" Rock Wall Boards 2: Starting from the top, place one Rock Wall Baord on top of the Rock Wall Sides, flush to the top and side. Attach it with two 2" wood screws in each side. 3: Fasten another Rock Wall Board directly under the first one. 4: Measure 3-3/8" down from the last board and make marks onto the Rock Wall Sides. Line up the top of another Rock Wall Board with the marks. Attach it with two 2" wood screws in each side.
STEP 9: ROCK WALL 1: Place the 5/4 x 3 x23-7/8" Rock Wall Top Cap on top of the Rock Wall Sides overlapping the top Rock Wall Board. 2: Make sure the ends of the Rock Wall Top Cap are flush to the side of the Rock Wall Sides. The front face of the Rock Wall Top Cap should be flush to the front of the top Rock Wall Board. 3: Attach the Rock Wall Top Cap with four #8 x 2" wood screws.
STEP 10: ROCK WALL 1: Fasten the 90 Green Bracket to the Rock Wall Sides with 5/16" X 1-1/2" hex bolts and 5/16" washers. 2: Tighten each bolt down so the bracket can still rotate.
STEP 11: ROCK WALL PANEL BOARD 1: Place the Rock Wall on top of the 2 x 6 x 47-1/2" Rock Wall Panel Board. The counter-bores should face you. Center the parts and leave a 3/4" gap under 90 green bracket to the bottom of the Rock Wall Panel Board. 2: Tip: place a scrap piece of wood under the Rock Wall Panel Board at each mark where you will be drilling holes to prevent split out as the bit exits the back side of the board. Mark through the hole in each 90 green bracket onto the Rock Wall Panel Board.
STEP 12: LEFT SIDE ASSEMBLY (OUTSIDE FACE) 1: Place the Left Front and Left Rear corner posts as shown below. The flange of the T-nuts should be on the INSIDE of the corner posts facing each other at the top, middle and bottom. 2: The flange of the T-nuts should be on the BACK side of the corner posts where a board is attached. 3: Attach each board to the corner posts with 5/16” x 2-1/2” hex bolts and 5/16” washers.
STEP 13: LEFT SIDE ASSEMBLY (INSIDE FACE) 1: Turn over the Left Side Frame Assembly 2: The flange of the T-nuts should be on the BACK side of the corner posts where the board is attached. 3: Attach the 2 x 4 x 47-3/8” Deck Support to the corner posts with 5/16” x 2-1/2” hex bolts and 5/16” washers. 4: Set the completed Left Side Frame Assembly aside and proceed to the next step. 2 x 4 x 47-3/8" Deck Support Flange of T-Nut should be on the BACK side of the corner posts where a board is attached.
STEP 14: FRONT BOARDS 1: Have an assistant hold up the Right Side Frame and Left Side Frame assemblies. 2: The flange of the T-nuts should be on the BACK side of the corner posts where a board is attached. 3: Attach the 2 x 6 x 50-1/4” Front Arched Top Panel Board to the corner posts with 5/16” x 41/2” hex bolts and 5/16” washers. 4: Attach the 2 x 6 x 50-1/4” Front Deck Panel Board to the corner posts with 5/16” x 4-1/2” hex bolts and 5/16” washers.
STEP 15: REAR BOARDS 1: The flange of the T-nuts should be on the BACK side of the corner posts where a board is attached. 2: Attach the 2 x 6 x 50-1/4” Rear Top Panel Board (Offset Down) to the corner posts with 5/16” x 4-1/2” hex bolts and 5/16” washers. 3: Attach the 2 x 6 x 50-1/4” Rear Deck Panel Board to the corner posts with 5/16” x 4-1/2” hex bolts and 5/16” washers. 4: Attach the 2 x 6 x 48-7/8” Sandbox Board - Rear (Offset Down) to the corner posts with 5/16” x 4-1/2” hex bolts and 5/16” washers.
STEP 16: SIDE SUPPORTS 1: Now is the time to level and square up your play set. Refer to the directions at the beginning of the manual for this process. Also see Step 33 for placement instructions. 2: Once you have the play set level and square proceed to substep 3. 3: Insert a T-Nut in the back side of a 2 x 4 x 47” Side Support. (See Detail B) 4: Attach the 2 x 4 x 47” Side Support to the 2 x 6 x 93-1/2” Sandbox Board - Right with a 5/16” x 2-1/2” hex bolt and 5/16” washer.
STEP 17: SCREWS IN DECK LEVEL 2 X 6'S 1: Drive #8 x 2-1/2" wood screws into the small predrilled holes in all the 2 x 6's at the deck level. The front and rear boards will receive 6 screws. The left and right boards will receive 2 screws.
STEP 18: DECK SPACERS 1: Place one 5/4 x 4 x 44-5/8” Deck Spacer between the front corner posts and place one 5/4 x 4 x 44-5/8” Deck Spacer between the rear corner posts as shown below. 2: Attach each Deck Spacer to the Deck Supports underneath them with four #8 x 2” wood screws.
STEP 19: ANGLE SUPPORTS 1: Place two 2 x 4 x 15" Angle Supports on the inside of the Front Deck Panel Board and the Rear Deck Panel Board. 2: Check each area where you are installing an Angle Support for squareness. Then install the Angle Support with #8 x 2-1/2" wood screws at the top and a #8 x 2" wood screw at the bottom with a #8 x 3" wood screw above it. 3: Place two 2 x 4 x 15" Angle Supports on the outside of the Deck Supports.
STEP 20: CENTER DECK SUPPORT 1: Place the 2 x 4 x 47-1/2" Center Deck Support underneath the Deck Spacers. Center it under the middle hole of each Deck Spacer. 2: Fasten the Center Deck Support to the Deck Spacers at the middle hole with #8 x 2" wood screws. 3: Measure at the Front Deck Panel Board and Rear Deck Panel Board as shown below and make two marks. Drill two 1/8" holes by 1-3/8" deep at the marks. 4: Fasten the Center Deck Support to the Front/Rear Deck Panel Boards with #8 x 3" wood screws.
STEP 21: DECK BOARDS 1: Place eleven 5/4 x 4 x 47-3/8" Deck Boards on top of the Deck Supports between the Deck Spacers. The Deck Boards should have approximately 3/16" of space between them. 2: If any of the Deck Boards are bowed slightly then place them with the bow side up. 3: Fasten the ends of each Deck Board to the Deck Supports with #8 x 2" wood screws. If the Deck Board is bowed up in the middle then push it down against the Center Deck Support before driving in the 2" wood screws.
STEP 22: ROCK WALL 1: Attach the 90 green brackets to the Rock Wall Panel Board with a 5/16" x 1-1/2" hex bolt and a 5/16" washer. 2: Now tighten the bolts in the side of the Rock Wall Sides. Tighten bolts up after ladder/ rock wall is attached.
STEP 23: PANEL SLATS 1: All the 5/4 x 3 x 30" Panel Slats will be installed on the inside of the 2 x 6 boards as shown below. 2: Place each Panel Slat into position as shown below and secure it with two #8 x 2" wood screws.
STEP 24: TARP SUPPORTS (VERTICAL) 1: Hammer a T-Nut into the 2 x 4 x 30-1/2" Right Vertical Tarp Support. (See Detail A) Attach the Right Vertical Tarp Support to the Side Tarp Support with a 5/16" x 2-1/2" hex bolt and a 5/16" washer. Square the Right Vertical Tarp Support to the Side Tarp Support and attach it with two #8 x 2-1/2" wood screws. 2: Hammer a T-Nut into the 2 x 4 x 35" Left Vertical Tarp Support.
STEP 25: TOP TARP BOARD AND END TARP BOARDS 1: Place the 2 x 4 x 47-1/2" Top Tarp Board on top of the vertical tarp support boards that were just installed. Attach the Top Tarp Board to the vertical tarp supports with four #8 x 2-1/2" wood screws. 2: Place the 2 x 4 x 50-1/4" End Tarp Boards on the end of the Side Tarp Supports. Attach each End Tarp Board to the Side Tarp Supports with four #8 x 2-1/2" wood screws.
STEP 26: TARP 1: Place the 47" x 107" Tarp over the Top Tarp Board with the side hemmed edges facing the ground. The finished side with no hems will face the sky. 2: The ends of the Tarp will wrap around the End Tarp Boards approximately 1-3/4" to 2" on the inside. 3: Attach the Tarp to the End Tarp Boards through the grommets with eight #14 x 1-1/4" pan head screws and eight 1/4" flat washers.
STEP 27: ROCK WALL ROCKS 1: Place the Rock Wall Rocks onto the Rock Wall Boards in a staggered pattern as shown below. Keep the holes in the Rocks away from the outer edges of the boards to prevent splits. 2: Attach each Rock Wall rock to the Rock Wall Board with the #14 x 1-1/4" pan head screws and 1/4" washers provided with the rocks.
STEP 28: SWING BEAM SUPPORT 1: Place the 4 x 4 x 47-1/2" Swing Beam Support against the outside of the right corner posts. 2: Attach the Swing Beam Support to the corner posts with 5/16" x 3-1/2" hex bolts and 5/16" washers into the t-nuts that were previously installed. Note the flange of the T-nuts should be on the BACK side of the corner posts where the support is attached. DETAIL A SCALE 1 : 6 T-Nut on BACK side of corner posts where the support is attached.
STEP 29: MINI IRON DUCTILE SWING HANGERS 1: Attach each Mini Iron Ductile Swing Hanger to the 4 x 6 x 96" Swing Beam with 3/8" x 7" carriage bolts and torque washers on top and 3/8" washers with 3/8" lock nuts on the bottom. 2: Cover the exposed threads on the end of the carriage bolts with the 3/8" vinyl bolt caps. Note you will have two sizes of vinyl bolt caps in your hardware; the smaller diameter ones are for 5/16" bolts and the larger diameter ones are for 3/8" bolts.
STEP 30: SWING LEG BRACKET AND SWING LEG ANGLE BRACKET 1: First, attach the Swing Leg Bracket to the swing beam with the 3/8” x 6-1/2” carriage bolt and torque washer on top and a 3/8” washer, 3/8” lock nut and 3/8” bolt cap on bottom. 2: Second, attach the Swing Leg Angle Bracket to the Swing Leg Bracket with a 3/8” x 7” carriage bolt and torque washer on top and a 3/8” washer, 3/8” lock nut and 3/8” bolt cap on bottom.
STEP 31: SWING LEGS 1: Place the end of the 2 x 4 x 86” Swing Leg with two holes in it inside the “u” shaped channel in the Swing Leg Bracket. Line up the holes in the leg with the holes in the bracket. 2: Attach the Swing Leg to the Swing Leg Bracket with two 5/16” x 2-1/2” hex bolts, four 5/16” washers, two 5/16” lock nuts and two 5/16” bolt caps. Leave the lock nuts a little loose until the next step. 3: Attach the other Swing Leg to the Swing Leg Bracket on the other side in the same manner.
STEP 32: SWING LEG CROSSMEMBER 1: Hammer a t-nut into the bottom hole on the inside of each Swing Leg. 2: Attach the 2 x 4 x 94” Swing Leg Crossmember to the outside of the Swing Legs with 5/16” x 2-1/2” hex bolts and 5/16” washers. 3: Now go back and tighten up the bolts at the top of the Swing Legs. Tighten these bolts on both sides after the cross- member is installed.
STEP 33: PLACEMENT OF YOUR PLAY SET 1: This play set is designed to be placed upon a relatively flat and level surface. If your yard is relatively flat and level where you are placing your play set then the Swing Leg Crossmember will sit about 1” below grade. 2: If your yard is “sloped” slightly then you should place your play set as shown below and “dig in” the Swing Legs. Afterwards go back and regrade the soil to level on both sides of the Swing Legs.
STEP 34: ATTACHING SWING BEAM TO PLAY SET 1: Place the Swing Beam on top of the 4 x 4 x 47-1/2” Swing Beam Support. 2: Check the Swing Beam for level. If the swing beam is level then proceed to substep 3. If the swing beam is not level then use a shovel to mark around the Swing Leg Crossmember. Remove the Swing Beam from the 4 x 4 x 47-1/2” Swing Beam Support so it does not fall on you. Dig out the area that you marked until a depth is reached that will make the swing beam level.
STEP 35: 90 GREEN BRACKET 1: Place a 90 Green Bracket centered underneath the Swing Beam and against the Swing Beam Support. 2: Attach the 90 Green Bracket to the Swing Beam and Swing Beam Support with #14 x 1-1/4" pan head screws and 1/4” washers.
STEP 36: WAVE SLIDE 1: Place the Wave Slide in the opening at the front of the play set. 2: The lip of the Wave Slide should sit on top of the Deck Spacer and the 2 x 6 x 50-1/4” Front Deck Panel Board as shown. 3: Attach the Wave Slide to the deck with two #8 x 1-1/4” wood screws. * DO NOT OVER TIGHTEN * 4: Once the slide is installed DO NOT lift the end of the slide. DO NOT bump the slide with a lawn mower.
STEP 37: STEERING WHEEL 1: Drill a 11/64” diameter hole 1-3/4” deep 3/4” below the screw in the middle Panel Slat located in front of the swing beam. 2: Place the Steering Wheel Insert inside the Steering Wheel. 3: Attach Steering wheel to the Panel Slat with the 5/16” x 2-1/2” lag screw and 5/16” washer provided with the steering wheel. Do not over tighten the lag screw or the steering wheel will not turn. 4: Snap the Steering Wheel Cap inside the Steering Wheel Insert.
STEP 38: SAFETY HANDLES 1: Place the Safety Handles against the corner posts as shown above the Rock Wall/ Ladder combination. 2: Space the Safety Handles up or down to suit the needs of your child. 3: Attach each Safety Handle with two 1-1/4” phillips pan head screws and 1/4” washers provided with each Safety Handle.
STEP 39: FLAGS 1: Place the Flags on the left and right sides of the play set on the vertical tarp supports as shown below. Note Tarp has been removed for clarity. 2: Attach the plastic base of each Flag to the vertical tarp support with the 1/2” phillips head screws provided with the Flags.
STEP 40: GROUND STAKES 1: Hammer each Ground Stake into the ground at an inward angle next to the 2 x 6 and 2 x 4 boards as shown below. Place a scrap piece of cardboard behind the Ground Stake to avoid hitting the board with your hammer. 2: Once the Ground Stake is hammered into the ground remove the scrap cardboard. 3: Attach the Ground Stake to the board with the 2" wood screw provided. 4: Repeat substeps 1-3 for the remaining Ground Stakes.
STEP 41: HANGING SWINGS AND NAME PLATE 1: Hang each swing to the Mini Iron Ductile Swing Hangers by placing a chain link over the hook end of the swing hanger. 2: Count equal numbers of chain links on each swing chain to move the swing up or down. 3: Fasten the name plate to the front of the swing beam with two #8 x 1-1/4" wood screws. Fasten Name Plate here with #8 x 1-1/4" Wood Screws.
STEP 42: TIC TAC TOE 1: LOCATE THE TIC TAC TOE BOX. 2: LOCATE TWO 5/4 X 3 X 17-1/2" TIC TAC TOE MOUNTS. 3: USE THE SCREWS INCLUDED WITH THE TIC TAC TOE TO ATTACH THE GREEN BRACKETS TO THE TIC TAC TOE MOUNTS. EACH GREEN BRACKET SHOULD BE CENTERED OVER THE TIE TAC TOE MOUNT. 4: FOLLOW THE INSTRUCTIONS IN THE BOX TO ASSEMBLE THE TIC TAC TOE OMITTING STEPS 6 AND 7.
STEP 43: TIC TAC TOE 1: Go up onto the deck and place the Tic Tac Toe in the opening at the rear of the fort. 2: The bottom of the lower Tic Tac Toe Mount should be 3" above the deck. 3: Attach the Tic Tac Toe Mount boards to the Panel Slats with #8 x 1-3/4" wood screws.
STEP 44: TELESCOPE 1: With the 1-1/4" wood screws provided in the telescope bag, fasten one of the Square Telescope Brackets to the Tarp Support above the Rock Wall 2: Place the Telescope Stand and Telescope into the slot of the Telescope Bracket. 3: Fasten the remaining Telescope Bracket to the opposite side that the first Telescope Bracket was installed on with the 1-1/4" wood screws provided with the Telescope.
STEP 45: SANDBOX SEATS 1: Place the 5/4 x 6 x 20" Sandbox Seats on top of the Sandbox Boards near the Rock Wall. 2: Fasten the Sandbox Seats to the Sandbox Boards with #8 x 2" wood screws.