Installation Sheet

Assembly Instructions: 1019-96
IMPORTANT:
• ALL INSTALLATION WORK SHOULD BE DONE BY ACCREDITED PROFESSIONAL.
• SHUT OFF POWER SUPPLY AT FUSE OR CIRCUIT BREAKER!
• USE ONLY THE SPECIFIED BULBS. DO NOT EXCEED THE MAXIMUM WATTAGE!
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn off the light and wipe down the
xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture. For deep cleaning, turn off the light
and remove the glass prior to cleaning. Hand wash glass with warm water and mild detergent. Dry with a lint-free or microber cloth.
For Customer Service, please
contact the place of purchase.
PREPARING FOR INSTALLATION
Carefully remove the new xture from the carton as well as
the yellow bag that holds all of the parts. See the important
notes above. Shut off power at the circuit breaker and
remove old xture from wall, including the old mounting
strap.
1. From the parts bag remove the mounting strap
assembly. One end of nipple (F) should be attached to
mounting strap (A) with hex nuts (D) in place. The other
end should have canopy loop (I) attached.
2. Attach mounting strap (A) to the junction box using
mounting screws (B) and a screwdriver. Tighten securely.
Pull house wires through the center of the mounting strap
(A). Unscrew canopy loop collar (H) from canopy loop
(I). Pass canopy (J) over the mounted canopy loop to
test the height. Approximately half of the canopy loop’s
exterior threads should be exposed, and the canopy loop
collarshouldtsnuglyontothecanopyloop.Remove
canopy (J) and adjust the height of nipple (F) and canopy
loop (I) until the desired height is reached.
DO NOT OPEN CHAINS OR CUT
WIRES UNTIL YOU ARE SURE
OF YOUR FIXTURE’S OVERALL
HANGING HEIGHT
TO COMPLETE ASSEMBLY, WIRING, AND INSTALLATION, TURN PAGE.
ASSEMBLING THE FIXTURE
For this xture it is important to determine your desired hanging height. Check your product specs for your xture’s height.
3. Prepare the chain for a mock hang: Attach one chain connector (G) to one end of the chain (K). Attach the chain connector and
chaintotoploopfoundontopofxturebase(L)whichcontainswireconnectors(W).Passthexturewiresfromtoplooponthetop
ofxturebase(L)upthechainconnectorandchain(everythreelinksorso),pullingthewiresuntiltaut.
4.Tomockhang:Keepinginmindyourpurchasedlight’sxtureheight,haveanassistantholdthexturebase(L)andattachthe
remaining chain connector (G) to any chain link on chain (K). Attach the chain connector (G) and chain link (K) to canopy loop (I). Step
backwhileyourassistantholdsthexturebase(L).Measurethecurrentchainheightbytakingthelengthfromthebottomofcanopy
loop(I)tothebottomofthexturebase(L)andaddyourlight’sxtureheight.Thetotalofthesemeasurementsisyourxture’s
overallhangingheight.Adjustthechainconnectorontootherlinksuntilyouaresatisedwiththeoverallhangingheight.
Note: We recommend an allowance of 30” between the bottom of your xture’s overall hanging height and the top of any
object it may hang over.
If you need additional chain, please contact the place of purchase.
5.Removeanyexcesschainwithachainopener.Closethechainconnectors(G)tosecure.Feedxturewiresthroughthecanopy
loop (I) and canopy (J). Slide canopy loop collar (H) and canopy (J) down onto the chain/wires. Pull the wires until taut. Trim the wires
to the desired length plus 8 to 10 inches.
6.Hooklongrods(Q-1)ontotheringsfoundonxturebase(L).Liftxturering(T)uptothelonghangingrods(Q-1)andconnectthe
bottomhooksoflongrods(Q-1)ontotheinnerrings(V)onxturering(T).
GND
JUNCTION
BOX
A
B
E
D
J
H
I
G
K
F
L
N
O
P
Q-1
U
U
X
Y
Q-4
W
W
N
V
V
M
T
X
Y

Summary of content (2 pages)