QUEEN BED 1
Estimated Time for Assembly 45:00 - 60:00 Weight Limitation LB 600 lbs Tools Needed All necessary tools are included in the package.
CAUTION: 3
Bed Parts are shipped inside a compartment in the back of the headboard.
Re m ove p a r t s f ro m h e a d b o a rd compartment 5
PACKAGE CONTENT CAUTION: DO NOT SLIDE BED AFTER ASSEMBLY. LIFT THE BED FRAME INTO ITS FINAL POSITION.
1. N + T M6X50 6 pcs P T N A ach “T” washers to “N” bolt. Connect the leg “B” to back of headboard “A”. Use the bolts to a ach.
2.
3. L M8X20 8 pcs (R) Q (L) L Thread “L” bolts into the holes in the headboard and footboard. Do not ghten. These will be ghtened in later steps.
4. M+ S M6X35 8 pcs P S M D A ach “S” washers to “M” bolt. Connect the top and bo om of each side rail with a “D” side leg. Use the bolts to a ach. E E Same assembly steps to the second set of side rail.
5. Hang the hooks at the ends of the side rails onto the “L” bolts in the headboard leg and the footboard. Do not fully ghten the “L” bolts. The bolts will be ghtened in a later step.
6. O M6X60 8 pcs O A ach adjustable leveling feet “U” to the bo om of leg “I”. Then assemble the slat system by a aching the slats “G” to the “J” supports and “I” legs. First, extend the slats. Then, line up the holes in the slats with the holes in the “J” supports and the holes in the tops of the “I” legs. Use an “O” bolt through the holes to a ach them together.
7. K M4X32 24 pcs I Then, adjust slat leveling feet on the bo om of leg “I” to a distance 1/2" above the floor. Floor line Leveling feet “U” Then, use screwdriver to install“K” screws into side rail cleat K L Finally, ghten all “L” bolts.