Installation guide

Installation Instructions
Pre-lnstallation Checklist
ALL INSTALLATION INFORMATION
ON THE FOLLOWING PAGES IS TO
BE USED FOR SINGLE AND DOUBLE
OVEN INSTALLATION!
Remove packaging materials.
Check behind hinges and under
false bottom. Remove labels on the
outside of the door, plastic on trims
and panel, all tape around the oven,
and any shipping screws securing
the oven to the base pad.
Temperature
Probe
Rack Supports
_T_ with Hex Nuts
Oven Racks
Broiler Pan Literature
and Grid Pack
G
Graphite
Lubricant
Open oven door and remove
literature pack, broiler pan and grid,
oven racks, rack supports and a bag
with 9 hex nuts.
Read Installation Instructions carefully
before you begin.
Be sure to place all literature, Owner's
Manual, Installations, etc., in a safe
place for future reference.
_'WALLOW_
!
i!£_2,2rL'_:.:,a,.
To Remove the Door (ifnecessary)
Door removal is not a requirement for
installation of the product, but is an
added convenience. To remove the door:
Open the oven door as far as it will go.
Push both hinge
locks down toward
the door frame,
to the unlocked
position. This may
require a flat-blade
screwdriver.
Hinge
Arm
DO NOT LIFT THE DOOR
Hinge
BY THE HANDLE!
II
Place hands on both sides_
of the door, and close the
oven door to the removal
position, which is most of
the way closed.
Removal Position
Lift door up and out
until the hinge arms
clear the slots.
ii / ii
_ ijJ
Hinge Clears Slot
NOTE: The oven door is very heavy, Be sure
you have a firm grip before lifting the oven
door off the hinges, Use caution once the
door is removed, Do not lay the door on its
handle, This could cause dents or scratches,
Place the oven on a table or platform
even with the cutout opening. (Platform
must support 175 Ibs. [79 kg] single,
350 Ibs. [159 kg] double.)
Remove the bottom trim from the top
of the oven. It will be installed at the
end of the installation process. The
trim is wrapped separately and taped
to the top of the unit.
3