Installation Guide

GE
Lighting
Installation Guide
imagination at work
(BT Series UL version)
Lumination
TM
LED Luminaires
BEFORE YOU BEGIN
Read these instructions completely and carefully.
Save These Instructions
Use only in the manner intended by the manufacturer. If
you have any questions, contact the manufacturer.
Tools and Components Required
• Phillips head screwdriver.
• UL approved conduit tting.
• UL approved twist-on wire connectors.
Prepare Electrical Wiring
Electrical Requirements
• LED driver must be supplied with 120-277VAC, 50/60 Hz
and connected to an individual properly grounded
branch circuit, protected by a 15 or 20 ampere circuit
breaker. Use Min. 75°C supply conductor.
Grounding Instructions
• The grounding and bonding of the overall system shall
be done in accordance with National Electric
Code (NEC) Article 600 and local codes.
WARNING/AVERTISSEMENT
RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all NEC and local codes.
• Use only UL approved wire for input/output connections.
Minimum size 18 AWG (0.75mm
2
).
RISQUES DE DÉCHARGES ÉLECTRIQUES
• Coupez l’alimentation avant d’’inspecter, installer ou déplacer le luminaire.
• Assurez-vous de correctement mettre à la terre le boîtier d’alimentation électrique.
RISQUES D’INCENDIE
• Respectez tous les codes NEC et codes locaux.
• N’utilisez que des ls approuvés par UL pour les entrées/sorties de connexion.
Taille minimum 18 AWG (0.75mm
2
).
BT22 Series BT14 & BT24 Series

Summary of content (3 pages)