Installation Guide

Prepare Electrical Wiring
Electrical Requirements
• LED luminaire must be connected to the mains supply
according to its ratings on the product label.
Grounding Instructions
• The grounding and bonding of the overall system shall
be done in accordance to the local electric code of the
country where the luminaire is installed.
GE
Lighting
Installation Guide
imagination at work
(For BT Series Luminaires)
Lumination
TM
Surface Mount Kit
BEFORE YOU BEGIN
Read these instructions completely and carefully.
Save These Instructions
Use only in the manner intended by the manufacturer.
If you have any questions, contact the manufacturer.
Tools and Components Required
Drill
Tape measure
Phillips head screwdriver
Socket head screwdriver
Fasteners capable of holding 30 lbs. (4 pcs.)
UL approved conduit tting
UL approved twist-on wire connectors
WARNING/AVERTISSEMENT
RISK OF ELECTRIC SHOCK
Turn power off before inspection, installation or removal.
Properly ground electrical enclosure.
RISK OF FIRE
Follow all NEC and local codes.
Use only UL approved wire for input/output connections.
Minimum size 18 AWG (0.75mm
2
).
RISQUES DE DÉCHARGES ÉLECTRIQUES
Coupez l’alimentation avant d’’inspecter, installer ou déplacer le luminaire.
Assurez-vous de correctement mettre à la terre le boîtier d’alimentation électrique.
RISQUES D’INCENDIE
Respectez tous les codes NEC et codes locaux.
N’utilisez que des ls approuvés par UL pour les entrées/sorties de connexion.
Taille minimum 18 AWG (0.75mm
2
).

Summary of content (3 pages)