User's Manual

2. WIRING
2-15
Connection
1. Unfasten four screws (M4×8) to remove the top cover from the processor unit.
2. Unfasten the three bolts circled below to remove the upper plate of the cable
clamp.
Processor unit, top view
3. Pass the cables through the clamp holes, then fasten the bolts removed at step 2
to fix the cables.
4. Connect the WAGO connectors to the I/O Board, referring to the interconnection
diagram. See the figure at step 2 for J13 and J14.
Unfasten these three bolts to remove the upper plate.
Unfasten this bolt to use
the lower clamp holes.
Clamp holes
(upper)
Clamp holes
(lower)
J4J4
J3J3
J8J8
J9J9
J10J10
J5J5
J6J6
J7J7
J11J11
J12J12
J13J13
J14J14
Lay shields of cables
under this clamp then
tighten the clamp.
J12 (main control unit)
For J13 and J14 (sub
control units).