Installation guide
ROUGH-IN DIMENSIONS (64.13CM)
.2-1/2 iN.
(6.35 CM)
75-1/2 IN.
(191, 7 CM)
54-5/16 IN.
(137.95 CM)
r
0
WATER INLETS j'
(REAR)
DRAIN OUTLE"
(REAR)
l
33/4 IN,
_c- (9.52 CM)
27 iN.
(68.58 CM)
16-1/4 IN.
(41.27 CM)
t
GAS SUPPLY
5-1/4 IN.l [
(13,33
CM) 6_
41 1! 43 IN.
- 4IN (109.22CM)
,.j.(,o,.77ca,
(74.77 CM) 3
(91,60 CM)
UNPACKING
!. Usingthe four shipping carton corner posts (two on each
side), carefully lay the laundry center on its left side and
remove foam shipping base.
2. Using ratchet with 3/8 inch (0.96 cm) socket, remove
mechanism shipping bolt and plastic spacer block from
NOTE: If the laundry center is to be transported at a
later date, the tub blocking pad, shipping bolt, and
plastic spacer block should be retained.
SHIPPING BLOCKS
47 IN.
(119,38 CM)
PLASTIC SPACER
BLOCK
30_13/16 IN.
(78.26 CM) --
1-7!8 IN.
(4.76 CM)
_ 4-13116 IN.
(12.22 CM)
11-7l 16 IN.
(29.05 CM)
,
4.
5,
.
Return laundry center to an upright position,
Remove:
Ca) foam tub blocking pad.
(b) foam shipping blocks from rear of unit,
(c) tape from dryer door.
(d) foam dryer support pads.
(e) inlet hoses.
From the back of the washer, remove the wire shipping
clips securing the drain hose and power cord (if
equipped). Plastic clamps secure the drain hose to the
right side of the washer backsheet. These clamps form a
standpipe to prevent water syphoning. DO NOT
REMOVE THESE CLAMPS.
Carefully move the laundry center to within 4 feet
(1,22 m) of the final location for the start of the
installation.
MECHANISM
SHIPPING
BOLT
_PING CARTON CORNER POSTS
FOAM
SHIPPING
PAD
POWER CORD (tF EQUIPPED)
DRAIN HOSE
5