Installation guide
CompleteInstallation:
1.Insertwindowsashsealbehindthetopofthelowerwindowsashandagainst
theglassoftheupperwindow(FIG.15).
2.Placethewindow-lockbracketontopoflowerwindowandagainstupper
windowsashonrightsideofthewindow(FIG,15).
3.Usea3/32"drillbittodrillstarterholesthroughtheholesinthebracketinto
thewindowsash(FIG.15).
4.Attachthewindowlock-brackettothewindowsashwithtwo#10X1/2"
round-headscrewstosecurewindowinplace(FIG.15).
5.Insertairconditionerintocabinet(FIG.16).
6.Reconnectelectronicsplugifpresent,Insertfronttabsoffrontpanelintotopof
cabinetandswingfrontintoplace(FIG.17A).
7.Attachbottomfrontofpanelwithfrontpanelscrews(FIG.17B).
8.Plugintoagrounded3prongoutlet,
9.PressRESETonthepowersupplycord,
FIG.16 FIG.17A
electronicsplug
Through-the-Wall Cabinet Installation:
Option l--wood, metal or plastic molding:
FIG.15
B
CA
D
A. Window lock bracket
B. Upper window glass
FIG.17B C. Window sash seal
D. #10Xl/2" round-head
_ screws
iNN
When using a wood, metal or plastic molding, the wood frame should line up with the inside wall as shown FIG.18.
Option 2--Plastered wall with no molding:
If the plastered wall is to be flush with the cabinet and no molding is used, the wood frame must be set 1/2" (13ram).
into the inside wall FIG.19.
FIG.18 A B C AB C
FIG.19
A. Molding C. Wood frame A. Plastered wall
B. Inside wall D. Louvers B. Inside wall
Install Wood Frame:
t. Construct the wood frame. See FIG.20 for dimensions.
C. Wood frame
D. Louvers
FIG.20
C
t
A. 16" (40.6 cm) C
B. 22-5/8" (57.5 cm)
C. Wood thickness
D. 2-1/2" (6.4 cm) minimum to
6-1/2"(16.5 cm) maxtmum
2. Measure the outside width and height of frame to determine wall opening dimensions. The wall opening
measurements should be :
Width : 22-5/8" (57.5 cm) plus twice thickness of wood used to build frame.
Height: 16" (40.6 cm) plus twice thickness of wood used to build frame.
Depth : 2-1/2" (6.4 cm) minimum to 6-1/2" (16.5 cm) maximum.
3. Cut the opening through the wall. Remove and save insulation.
4. Apply the wood preservative to the outside exposed surface.
5. Insert the frame in the wall opening. Square and level frame.
6. Attach frame securely to the wall.