Installation guide

OPTIONAL:Caulkingandinstallationof trimoninterior
wallmaybedone.Youcanbuywoodfromyourlocallumber
o1"hardwaresupply.Ontheoutside, caulk openings around k_p
and sides of cabinet, and all sides of wood sleeve to the opening.
NOTE: See Step 7, item 3 of Window Mounting Instructions
for bottom rail seal location.
Masonry Construction
!. Cut or build a wall opening in the masonry wail similar
to the frame construction(refer to Step 2 of Thru-the-WalI
Inslallation for a wall thickness greater lhan 8-1/2").
2. Secure cabinet in place using masonry nails, or the right
masom T anchor screws.(Another way to do Hlis is lo build
an in -between frame of 2x4 's as shown in lhe Step 2 Prepare
Wall illustmtions-but mal<c it double fi'amed on either side,
mid install belween masonry wall opening and cabincl.
Frame must be securely anchored lo masonry wail opening)
This way gives vel_ good louver clearance on eifl_erside ofcabinel.
3. install a linted lo support mason U wail above cabine_.
Existing holes in cannel cgul be used and/or additions holes
can be drilled to fasten cabinet m vmious positions.Be sure
that side louver clearalce is in accordance wilh Slop I above.
4. install exterior cabient supppon bmcl<els as shown in
Step 2 of Thru-/he-Wall Installation.Caulk or flash if
neede, to provide a welher-tight seal around top and sides
of cabinet.
5. To complele installalion, apply wood 1rim molding
around room side projection of cabinet.