Installation and Operation Manual

4
General Specications
Installation Checklist
q Inspect all components and accessories for damage before and after
installation.
q
Remove the cardboard wall sleeve support and grill weatherboard.
q Check for proper wall sleeve installation in accordance with the wall
sleeve installation instructions.
q
Check for a subbase kit or other means of structural support which
is required for ALL installations projecting more than 8" into room.
q
Install the recommended Condensate Drain Kits for complete
condensate removal.
q
Ensure that the chassis is installed in a 16" high x 42 wide wall sleeve
that is no deeper than 13 ¾". A bafe kit is required if the sleeve
exceeds that depth.
q
Ensure that chassis and chassis front cover are installed and secured
properly.
q
Ensure that drapes, bed, bedspread, furniture, etc. DO NOT block
either return or discharge air grilles.
q
Inspect the condenser air inlet and outlet for any obstructions
(shrubbery, etc.)
q
Ensure that 'reset' button is pressed on LCD device (only on cord
connected models).
MODEL NUMBER
07 =7,000 Btuh
09 =9,000 Btuh
Nominal Capacity
12 =12,000Btuh
15 =15,000Btuh
Series
PD =Friedrich DigitalPTAC
System
E=Coolingwithorwithout electric heat
H= Heat Pump with AuxiliaryHeat
Voltage
K=230/208V - 1Ph. - 60 Hz.
R=265V - 1Ph. - 60 Hz.
NominalHeaterSize (230Vor265V)
2 = 2.5 KW 3 = 3.5 KW 5 = 5.0 KW*
* 5.0 kw only available on 9,000 12,000 and 15,000 BTU models
Chassis
S= Standard
Design Series
EngineeringDigit
PD
Note: All PTAC models with a C design series or
later come standard with Diamonblue seacost
protection and digital controls.
X = Accessory
E