PATIO COVER INSTRUCTION SHEETS WeatherStopper Patio Cover Installation Structural Insulated Panels STEP #1: Installing Roof Header (#B) A Select which attachment method OPTION #1, #2 or #3. (NOTE: if mounting to a masonry wall the anchors are NOT INCLUDED) B Select the area on wall or fascia for the Roof Header #B. Using a chalkline, snap a level line. C NOTE: roof panels must have a Minimum of 1/2" per foot slope for the length of your roof panel for water drainage. If you can get more pitch DO IT.
PATIO COVER INSTRUCTION SHEETS Make sure to have 2 screws within 4" of each end of the Roof Header H2 If mounting to House wall OPTION #2 or #3, After predrilling and caulking the Roof Header(#B), Set the Roof Header against the Wall and fasten using the #12x3" sms screws thru the wall into the wall studs. Go back and predrill a second 3/16" hole that will line up to hit the wall studs. Fasten to the wall studs.
PATIO COVER INSTRUCTION SHEETS D E F G A Make sure both halves of the beam are straight, then fasten through the Top Post Bracket into the second Beam then into the Beam Splice using (2)two #14x1-14/ tek screws Rotate the beam over twice, make sure the beam is straight, then fasten repeating steps C&D fastening through the Top Post Bracket(#I) into both Edge Beams & the Beam Splice(#G) Rotate the beam over one time so the Top Post Bracket legs are up, then fasten (2)two #14x1-1/4" tek screws into each 3"
PATIO COVER INSTRUCTION SHEETS Find the 8 "Setback Brackets." Measure and place a pencil mark on the prepared 3" Edge Beam, 6” from each side of the Top Post Brackets (I). Set the brackets on the top side of the prepared 3” Edge Beam at the 6” pencil mark and fasten each side using 4 #14 tek screws 2 on each side. 6 Setback Brackets should now be fastened to the 3" Edge Beam. Measure between the Top Post Brackets and mark the midpoint on the 3" Edge Beam.
PATIO COVER INSTRUCTION SHEETS Insert this second 3" Edge Beam into the top of the Setback Brackets. Make sure the ends of both 3" beams are lined up. Fasten the Double beam to the Setback Brackets using 4 #14 tek screws each side.
PATIO COVER INSTRUCTION SHEETS B C D E Subtract 3-1/2 inches from your measurement AND *1/2" per ft of your roof panels (*minimum) if your roof panels are 10ft = 5" … if roof panels are 12ft = 6” *if you can get more pitch do it* Example: if you bought a 12ft deep x 22ft wide S.I.P.
PATIO COVER INSTRUCTION SHEETS H I J Once the Edge Beam assembly is LEVEL, take a third post, hold it against the Edge Beam in the center location near the Top Post Bracket(#I), mark a line on the post along the bottom of the beam. Cut the post above the marked line. Repeat STEP "3-D" to fasten the Post(#J) to the Edge Beam(#F) If you have more than 3 posts…Repeat STEP "3-H" for any remaining posts Laydown the Edge Beam and Post Assembly. Insert the Bottom Post Bases(K) into the bottom of each Post(#J).
PATIO COVER INSTRUCTION SHEETS B See dwgs below, measure and Mark the REAR SIDE of Post locations. If you have 10ft roof panels measure/mark 8'-9" or if 12ft roof panels measure/mark 10'-9". Mark post locations out from house wall for the first and last post….then pop a chaulkline connecting the first and last marks. **These post measurements are critical for future installation of Rolldown LifeScreens C Stand up the Edge Beam and Post Assembly tying to ladders or with a few building buddies.
PATIO COVER INSTRUCTION SHEETS D Cut open a tube of sealant and load into caulking gun. Set ladder at house side, left end of Roof Header. Looking from backyard at the house, have the FEMALE EDGE of ROOF Panel to the LEFT side. Look at both sides of the panel for any dents…if there is a dent or ding you can flip the panel so the dent will be on the TOP of the S.I.P. Patio Cover.
PATIO COVER INSTRUCTION SHEETS Check Roof panel is SQUARE J K L Line up all POSTS on the front side of the chaulk line popped in step #4-B Keeping back side of post BOTTOMS on the chaulk line...Plumb level the front side of the post, only moving the top…when it is plumb level, REMOVE THE CARDBOARD... Then Use a hammer to slowly drive a 5inch tek screw with washer SLOWLY through the top skin of ROOF PANEL until it hits the BEAM keeping it 4 inches away from MALE edge of panel.
PATIO COVER INSTRUCTION SHEETS M ANCHOR the POSTS: Set each post in front of the chaulk line…use 4ft level to plumb level the post on front and side of each post. Once post is plumb level both directions drill a 3/8" hole through the Bottom Post Bracket(#K) into the slab and insert the WEDGE ANCHORS and tighten Repeat for each post STEP #5 : Setting All Roof Panels A B Carefully unwrap the next roof panel…look for any dents….turn panel so any dents or dings are up on top side.
PATIO COVER INSTRUCTION SHEETS C Having the Next Panel Unwrapped… repeat Step 4-E&F Keep ROOF PANEL 4" away from first panel and slide it all the way into the ROOF HEADER Person #1 stands by the first post to hold it steady while person #2 is on ladder chest high with roof panel.
PATIO COVER INSTRUCTION SHEETS H When there is one roof panel left on ground to put up. STOP.
PATIO COVER INSTRUCTION SHEETS C Set the Gutter Splice(#C) into the Extruded Gutter(#D) up to the 12" Mark Push the Splice down tight into Gutter & the Sealant, Fasten through the Gutter FACE using (4) Four #10 tek screws through the Four Marks …Fastening through the Gutter and into the Splice Fasten (2)Two #10 tek screws through the Back Side of the Gutter 2" away from each end of the Splice & 1-1/2 inch up from bottom of gutter D E F Caulk the screw threads inside the Gutter & Splice.
PATIO COVER INSTRUCTION SHEETS G H I J Take Second piece of Extruded Gutter(#D). Measure inside the LEFT End of Extruded Gutter(#D) 11-1/2" and mark it. Hook Tape on Left End of extr Gutter(#D) and measure to the RIGHT and mark at 2” & 10" on gutter face… then Measure up 1" from Gutter Bottom and Down 1" from the TOP. Make the 4 Marks for Screw Locations on the Face of Extruded Gutter. Use sealant in the bottom corners of the Gutter, zig zag across the bottom, the gutter front and back as in STEP 6B.
PATIO COVER INSTRUCTION SHEETS STEP #7 : Installing Extruded Fascia(#E) A B C D NOTE: for ease of installation the Extruded Fascia for each side comes in 2 pieces to be butt together. Take one piece of Extruded Fascia(#E) hold up against roof panel at house end. Check if it will need to be cut at an angle…Mark the angle at the vey end of the Fascia(#E) CAREFULLY Only cut near the very end of the Fascia(#E). Test fit the cut. Cut it again if needed for a better fit.
PATIO COVER INSTRUCTION SHEETS E Adjust the two Fascias where they butt together for straight joint. Fasten through the top legs of Fascia into roof panels F Fasten the TOP LEG of Fascias down into Roof Panels...spacing screws no more than 24" apart. Then Fasten Upward through the bottom leg of the Fascia using the same 24" spacing.
PATIO COVER INSTRUCTION SHEETS STEP #9: Finish Fastening & Sealing NOTE: Do Not walk of Roof Panel SEAMS ROOF PANELS A B C D E F G Fasten TOP side of Roof Panels downward through the Roof Header(#B) Leg into the roof panels using (3)Three #10 tek screws. **Keep All fasteners 4inches away from all roof seams** (3) Three screws in each panel….
PATIO COVER INSTRUCTION SHEETS Fastening & Sealing the GUTTER A B C Fasten through the TOP of Gutter Leg downward into the Roof Panels (2) Screws per roof panel, 4inches away from all roof seams Fasten Upward through the Bottom Leg of Gutter into the Roof Panels (2) Screws per roof panel, 4inches away from all roof seams Caulk around and on Top of every Gutter Screw on TOP SIDE ONLY On TOP SIDE ONLY Squeeze a Smooth Bead of Sealant along the back Leg of the Gutter to the Roof Panel STEP #10: Peel n Seal t
PATIO COVER INSTRUCTION SHEETS C D E F Measure the Roof Top from the attachment against the house, outward to inside the Gutter Edge & add 2inches Count how many roof Seam Joints you have then Cut that many Strips of Peel n Seal tape NOTE: you can piece 2 pieces together if needed and overlap them 3 inches.
PATIO COVER INSTRUCTION SHEETS Step 11: Flashing support@FourSeasonsOLS.