Installation Guide

24
INSPIRE RAILING INSTALLATION
Step 4: Top Bracket Installaon
1. Posionwood2”x4”(actual1-1/2”[38mm]x3-1/2”
[89mm])underboombracket.AsshowninFig.1.
2. Fullyrakeandplacepanelnexttopostsontopofwood 2”
x4”(actual1-1/2”[38mm]x3-1/2”[89mm]).
3. Clamppaneltopostin4places.
4. Usealeveltoensurepanelandpostsarebothstraight.
5. Posiontoprailbracketsparallelwithpanel&atcentered
onpost.Make sure inside boom of bracket is ush with
boom of rail. As shown in Fig. 3.
6. Usepenciltomark top edge of bracket locaononpost.As
showninFig.4.
7. Dis-assemblethebracketsbyremovingthebarrel&screw.
8. Placetop rail bracketbasesonprevioustopedgemark.
Center the base on the post and use pencil to add marks
fortwoscrewholelocaons. AsshowninFig.5.
Tip:
• Besurebasesarecenteredonpostswhenmakingmarks.
DO NOTmountbracketsintoboompostinthisstep.
Fig. 3
Insideboom
face of Bracket
andBoom
of rail are
ush
Fig. 4
Fig. 5
Fig. 1
Wood 2”x4”
(actual1-1/2”
x 3-1/2”[38mm
x89mm])