Instructions / Assembly
Table Of Contents
- Forsaire Counterflow Direct-Vent Gas Wall Furnaces
- Installation Record
- Basic Description
- Tools Needed
- Materials
- Helpful Installation Information
- Optional Accessories
- Unpack Your Furnace
- Locating Wall Furnace & Thermostat
- Recessed Mount Installation
- Offset Wall Installation
- Surface Mount Installation
- Vent Installation
- Trim
- Mounting Your Furnace
- Gas Supply and Piping
- Electrical Wiring
- Start-Up Procedure
- Operating Your Furnace
- FOR YOUR SAFETY, READ BEFORE LIGHTING
- LIGHTING INSTRUCTIONS
- TO TURN OFF GAS TO APPLIANCE
- FOR YOUR SAFETY, READ BEFORE LIGHTING
- LIGHTING INSTRUCTIONS
- TO TURN OFF GAS TO APPLIANCE
- FOR YOUR SAFETY, READ BEFORE LIGHTING
- LIGHTING INSTRUCTIONS
- TO TURN OFF GAS TO APPLIANCE
- FOR YOUR SAFETY, READ BEFORE LIGHTING
- LIGHTING INSTRUCTIONS
- TO TURN OFF GAS TO APPLIANCE
- How To Care For Your Furnace
- How To Care For Your Furnace
- Furnace Technical information
- Wiring Diagrams
- 4. A metal or plastic identification plate shall be mounted at the exterior of the building, four feet directly above the location of vent terminal. The plate shall be of sufficient size to be easily read from a distance of eight feet away, and read "...
- Gas Conversion Kits
- Installation Instructions
- Service Hints
- How to Order Repair Parts
Installing Your Furnace
FASTEN FURNACE TOP (SURFACE MOUNTING)
Fasten the furnace top to wall using two (2) metal anchors
(packed in plastic bag with thermostat) by placing them over the
back flange of the furnace top and screwing them to the wall.
Refer to Fig. 21.
FASTEN FURNACE TOP (RECESSED MOUNTING)
Fasten the furnace top by drilling two (2) holes through the side
flanges of the furnace top and securing it with two (2) screws or
nails into the wall studs. Refer to Fig. 21.
CAUTION: Be careful not to damage furnace components
or wiring when drilling holes.
FIGURE 22 Burner Pan
FIGURE 23 Ignition Control
P321900
FIGURE 21 Furnace Mounting