Dual Installation Guide
Table Of Contents
6
5 ATTACH BRACKET ASSEMBLY TO CAVITY
For flush installation
3 Measure 4 1/4” (108mm) back from the ceiling front edge
of the cavity and mark a line (C) across the centre line.
4 Place the joiner bracket to ceiling surface.
Align Face1 to the marked line (C).
Align Face 2 along the centre line of the cavity.
For proud installation
5 Place the joiner bracket forward of the flush installation
location. To determine the location,
Measure the depth of the door panel that protrudes
from adjacent cabinetry front surface (D).
Calculate the distance (E) of proud installation location,
4 1/4” (108mm) – D = E
Face 2Face 2
Face 2Face 1
Attach top joiner bracket and fixing bracket to cavity
1 Attach the top joiner bracket to the cavity fixing bracket with M5x12 socket head cap
screws.
For 80” (2032mm) installation, use the upper slots of the cavity fixing bracket (A).
For 84” (2134mm) installation, use the lower slots of the cavity fixing bracket (B).
SCALE 1:10
84” (2134mm)
72” (1829mm)
D
ceiling front edge
C
41/4”
(108mm)
41/4”(108mm)
centre linecentre line
C
D
E
F
IMPORTANT!
Ensure the anti tip brackets are installed before attaching the cavity fixing bracket. Refer to separate ‘Installation guide’ supplied with your appliance.
Ensure the water and power supply are already connected, and door panels installed before attaching the cavity fixing bracket.
Note: illustration above shows cavity for RS36W84/RS9121W model.
A
B
top joiner bracket
cavity fixing bracket
6 Place the joiner bracket to the ceiling surface
Align Face 1 to the marked line (E)
Align Face 2 along the centre line of the cavity.
7 Fix the joiner bracket with 8x16 mush washer screws (F).
Loosely fix the screws to enable adjustment in the centre
of each slot of the joiner bracket.
2 Measure the width of the cavity. Mark a line on the ceiling along the centre of the cavity.