EZ-Connect Manual Transfer Switch Installation & Operating Manual This manual should remain with the unit. Global Power Products www.globalpowerproducts.
Terms and Conditions of Usage TERMS AND CONDITIONS. Upon breaking the seal attached to the installed EZ-Connect™, you expressly agree that usage is restricted and subject to the following terms and conditions (“Terms and Conditions”). INSTALLATION AND CARE OF PROPERTY. The EZ-Connect™ unit must be installed by an Approved Installer and may not be removed or modified by anyone other than an approved installer.
i Warranty and Service Information EZ-Connect™ Manufacturer Limited Warranty Global Power Products warrants EZ-Connect for a period of one (1) year after delivery of goods, where specified that the goods are, under normal use and service, free from defects in materials, and workmanship. No other warranties or representations, whether written or oral, shall be binding upon Global Power Products.
ii Important Safety Instructions Read the following information carefully before attempting to install, operate or service this equipment. Also read the instructions and information on tags, decals, and labels that may be affixed to the EZ-Connect manual transfer switch.
iii Important Safety Instructions General Hazards Any AC generator that is used for backup power if a normal (utility) power source failure occurs, must be isolated from the normal (utility) power source by means of an approved transfer switch. Failure to properly isolate the normal and standby power sources from each other may result in injury or death to electric utility workers, due to back-feed of electrical power.
iv Table of Contents Warranty Information ........................................................................................................................... i Important Safety Instructions ....................................................................................................................... ii-iii Table of Contents ................................................................................................................................................
1 Section 1 – General Information 1.1 Introduction Thank you for purchasing a Global Power Products EZ-Connect manual transfer switch to safely connect a portable generator to your home during a power outage. This manual has been prepared especially for the purpose of familiarizing personnel with the design, application, installation, operation and servicing of the applicable equipment. Carefully read all instructions before using EZ-Connect.
2 Section 1 – General Information 1.5 Selecting A Portable Generator What Kind of Generator Do I Need? There are a wide variety of portable generators available for purchase. Some are more suitable than others for connecting to your house.
3 Section 2 – Installation DANGER! WARNING! Verify both UTILTY and ALTERNATE power supplies are OFF before trying to connect power source and load lines to the EZ-Connect transfer switch. Supply voltages are extremely high and dangerous. Move handle on EZ-Connect into OFF position. Power conductors and sending wires may have voltage present that can cause severe personal injury or death.
4 Section 2 – Installation 2.5 Opening the Door Depress the padlock-able catch at the bottom of the door and pull the door towards you to open. It will detach as you slide the door toward the ground. 2.6 Removing Inner Cover This should only be attempted by a certified electrical contractor. Figure 2.1 Hex Handle A (male) Refer to Figure 2.1 Once you have opened the front cover you will gain access to the handle.
5 Section 2 – Installation DANGER! Verify both UTILITY and ALTERNATE power supplies are OFF before trying to connect power source and load lines to the transfer switch. Supply voltages are extremely high and dangerous. Move handle on EZConnect into OFF position. NOTICE! The installation must fully comply with all applicable codes, standards, and regulations. Remove existing load wires coming from the home.
6 Section 3 – Operation 3.1 Setup Procedures Carefully read all instructions before using the EZ-Connect. This will help to prevent accidents or damage to equipment that might otherwise be caused by carelessness, incorrect application, or improper procedures. The best time to prepare for a power outage is before there is an actual interruption of utility-supplied power. The following are suggested steps to prepare for an actual power outage using your portable generator with the EZConnect.
7 Section 3 – Operation STEP 3. Insert the male plug of the power cord into the correct NEMA 120/240 volt outlet on the generator. STEP 4. Plug in the female end of the power cord into the side receptacle on the EZ-Connect transfer switch. STEP 5. Turn off the idle setting (if present) on your generator. This will ensure that your generator will operate at the correct speed and voltage. STEP 6.
SAMPLE WORKSHEET Generator Size: (Watts) B Load Refrigerator 7200 C Start Factor X 3 D Run Watts = E Load Watts 1000 = 3000 X Sump Pump 2 X 1000 = 2000 Computer 1 X 200 = Fan (central) ¼ hp 3 X 400 = 1200 Lights X = X = 200 F Number Wattage 60 5 = 300 1 = 100 0 = 0 X 100 X 150 X Total: 6800 G
WORKSHEET A Generator Size: (Watts) B Load C Start Factor X D E Run Watts = Load Watts = X Lights X = X = X = X = X = F Number Wattage 60 = X 100 = X 150 = X Total: GLOBAL POWER PRODUCTS 225 Arnold Road Lawrenceville, GA 30044 Phone: 800-886-3837 Fax: 770-736-8231 www.globalpowerproducts.