Z P J S F L 5 2 0 6 D C B X E 2 6
x4 x4 x2 x7 x10 x10 Installation Guide Balance pieces x1 x5 Canopy x1 Hanger bracket x1 Blade x3 Remote control x1 Spiral package Light Cup x1 Motor x1 Decorative covers x1 Leaves fork x3 6" x1 25" x1 Glass lamp cover x1 Downrod and hanging ball Light cover x1
Installation Preparation To prevent personal injury and damage, ensure that the hanging location allows the blades a clearance of 2.3m from the floor and 76cm from any wall or obstruction. Be sure the outlet box is securely attached to the building structure and can support the full weight of the fan. 76cm From Wall or Nearest Obstruction 2.3m blades to Floor Preparing the Fan Site Downrod Installation This fan can be mounted with a downdrod on a normal or vaulted ceiling.
Installing the Hanger Bracket Wood Ceiling Concrete Ceiling Please drill φ8mm hole on the concrete ceiling, and insert the bolt. Align bracket with the hole, then tighten with nut.
Assembling and Hanging the Fan electrical wiring Canopy Decorative covers hanging ball slot through clip R clip Adapter yoke set screw If you wish to extend the hanging length of your fan, you must remove the hanging ball from the 6 inch downrod provided to use with an extended downrod (included) . (If you wish to use the 6 inch downrod, please proceed to instruc ons below.) To remove hanging ball, loose set screw on hanging ball and remove pin and clip. Lower hanging ball and remove stop pin.
Remote control connection DC: Ground wire L N green/yellow stripe Neutral N (White) Input L (Black) Input N (white) Remote control receiver Light L(blue) Grey DC motor U Red DC motor V Pink DC motor W Receiver place: 6
Canopy Assembly ok Canopy 2 1 3 raise canopy to hanging bracket,aligning loosened screws in hanging bracket with slotted holes in canopy.Twist canopy to lock.Re-insert screws and secured all screws with screwdriver. with hanging bracket secured to the out let box and able to support to fan,you are now ready to hang your fan. Grab the fan firmly with two hands.Slide downrod throughopening in hanging bracket and let hanging ball rest on the hanging bracket.
Install the lampshade Connection Box OK Light cover The lampshade is paired with the two lamp lines on the junction box, and pay attention to distinguish the male and the female terminals. Remove one screw on the junction box, hang the two buckle of the lampshade on the other two screws of the junction box, then rotate the buckle in place, and finally tighten the three screws on the side.