Use and Care Manual

12
Deep Well Installation (continued)
2
Attaching the nozzle and venturi
to the ejector
3
Connecting the foot valve to the
ejector
Wrap the threads of the venturi tube (B) (J32P-18/#11) with
thread tape.
Attach the O-ring (D) on the nozzle (C) (#02) and screw the nozzle
(C) (#02) into the venturi tube (B) (J32P-18/#11).
Attach the venturi tube (B) (J32P-18/#11) with the nozzle (C) and
O-ring (D) to the Ejector.
Wrap both ends of a 1-1/4 in. x 3 in. nipple (sold separately)
with thread tape (sold separately).
Thread the nipple into 1-1/4 in. foot valve (sold separately).
Thread the other end of the nipple into the bottom of the
ejector.
Hand tighten, and then tighten 1-1/2 turn with a pipe wrench.
4
Connecting the rigid pipe to the
ejector
5
Sliding the pipe assembly into
the well
Connect two pipes (1 in. drive, 1-1/4 in suction) to the ejector.
NOTE: If use PVC pipe to connect, a 1 in. x 3 in. nipple is
required.
Before sliding the pipe assembly into the well, firmly clamp the
assembly with a pipe clamp (not included) to prevent the
assembly from sliding down into the well.
Keep the 1 in. pipe 2 in. shorter than the 1-1/4 in. pipe.
B
C
D