User's Manual

EZBee series Manual / Ver. 1.0
54
2.
2. 2.
2. Start
Start Start
Start PAN
PAN PAN
PAN Network
NetworkNetwork
Network
For starting a PAN, type the AT commands related to a module ID, PAN
ID and channel number as shown in the following figure. The module ID
should be 0 for a coordinator setting. Finally type
AT&PS
AT&PSAT&PS
AT&PS”
to start the
PAN.
If the PAN is started successfully,
$NWK=COORD
$NWK=COORD$NWK=COORD
$NWK=COORD
message is
displayed. It means the EZBee M100 connected to a serial port is
assigned as a coordinator in the PAN.
The PAN ID and channel number can be assigned differently as user‘s
wish.
From now on, we call this terminal as a
Coordinator
Coordinator Coordinator
Coordinator Terminal
TerminalTerminal
Terminal
, and the
EZBee M100 connected to the coordinator terminal as a
Coordinator
CoordinatorCoordinator
Coordinator
Module
ModuleModule
Module
.