Assembly Instructions

Windmill Obelisk
© 2018 Distributed by Menard, Inc. Eau Claire, WI 54703 MADE IN CHINA
Assembly Instructions
277-2836
4.
Parts List
Part # Description Quantity
1. 2. 3.
Enchanted Garden
F
I
J
H
G
A
B
C
D
F
H
I
J
G
Wheel
Rod
Nut
Small Side Panel
1
1
2
2
2
1
1
3
1
4
Large Side Panel
Weathervane
Stake
Washer Nut
Washer
Cap
A
B
C
D
E
E
E
D
F
K
I
G
A
B
C
I
I
Insert bottom end of Small Side Panel (D)
into hole at bottom of Large Side Panel (E)
at 45º angle then rotate upward. Repeat
with the other Small Side Panel (D).
Insert bottom of the other Large Side
Panel (E) into the Small Side Panels (D) at
a 45º angle and rotate upward. The four
sides should now form a pyramid.
If Windmill Obelisk is placed on soft
ground it may be anchored with Stakes (H)
through each of the four feet
Insert the threaded end of Rod
(B) through part (I), the hole in
the top plate of both Large Side
Panels (E) and connect with two
Nuts (C). Slide the Weathervane
(F) into the Rod (B). Complete
the windmill assembly by
placing Wheel (A) onto the
threaded end of Weather-
vane(F), attach Washer (I), Cap
(J), and Washer (I) then connect-
ing with Washer Nut (G).
Questions, problems, or missing parts? Before returning
to your retailer, call our customer service
department at
1-800-543-0031, 8 a.m.-5 p.m., EST, Monday-Friday.

Summary of content (1 pages)