Installation Guide

Faux Wood Mantel
installation instructions:
2 × 4 (For Blocking)
Construction Adhesive
Power Drill
Saw
Chalk Line/Level
Screws
Stud Finder
STEP BY STEP
INSTRUCTIONS
TOOL & MATERIAL
CHECKLIST
SPECIAL INSTRUCTIONS
& NOTES
EXAMPLE
INSTALLATION DIAGRAMS
Thoroughly read through the installation instructions to familiarize yourself
with the process before beginning installation.
Before installation acclimate the mantel to the room for at least 24 hours.
Safety Instructions
Make sure to use the correct tools recommended.
Wear proper protective gear.
Follow xture, power tools, paint manufacturers’ instructions, and users manuals.
Use common sense and follow good construction practices.
1. If needed, measure inside width of the
beam and cut wood blocking to t in-
side width dimensions. (Diagram A)
2. Simply attach wood blocking into studs
in desired installation location.
(Diagram B)
3. Apply adhesive to the 2 x 4 blocking.
4. Slide mantel over the 2 x 4 and screw
through the top of the mantel to anchor
it into the 2 x 4. (You can apply adhesive
on the edges of the mantel for extra
security.)
(Diagram C)
Note: We recommend using deck
screws as the thread pattern is made to
go through ner grained woods without
splitting and reduces the chance of any
damage.
Diagram A
Diagram C
Diagram B
We Can Help. Call (866) 607-0453
www.ekenamillwork.com
Industry leading manufacturer of urethane, PVC, wood, rustic, and metal millwork

Summary of content (1 pages)