Installation & Assembly
CASING/CHAIR/PANEL
installation instructions:
construction adhesive
elastomeric adhesive caulk
caulking gun
nishing nails
miter saw
putty knife
chalk line box & pencil
TOOL & MATERIAL
CHECKLIST
IMPORTANT INFO
• It is highly recommended that you paint or nish moulding before you install it.
• Once installed, you can apply any necessary touch‐up paint or nish. Note: A high quality exterior
grade latex paint is recommended.
• ‐Place moulding in room 2 to 3 days prior to installation. This allows the moulding to adjust to the
temperature of the room.
• ‐Clean installation surface and back of moulding of all dirt and dust with a clean cloth or sponge.
Make sure that the surface and the back of the moulding are completely dry before attempting
installation.
SAFETY INSTRUCTIONS
Make sure to use the correct tools recommended.
Wear safety goggles.
Follow xture, power tools, and paint manufacturers’ instructions and users manuals.
Use common sense and follow good construction practices.
Medallions are not load‐ bearing. Do not use them to support electrical xtures or ceiling fans.
1. Apply a continuous 1/2” bead of construction adhesive along the back of
moulding lengths.
2. Press moulding against wall at the desired location. Use nishing nails to
secure moulding intoplace.
3. Apply caulk in remaining gaps and smooth with nger or putty knife. Use
caulk or lightweightspackle to ll in holes left from nishing nails.
4. Touch‐up moulding as needed using high quality latex paint.
WALLCONSTRUCTION
ADHESIVE
PANEL MOULDING