ECS4110-28P_Installation Guide-R02

– 12 –
2 Installation Overview
This chapter includes these sections:
“Package Contents” on page 12
“General Installation Guidelines” on page 13
“Installation Precautions” on page 13
“Switch Installation Tasks” on page 14
Package Contents
After unpacking the switch, check the contents to be sure you have received all the
components.
ECS4110-28P Switch
Rack Mounting Kit — contains two brackets and eight screws
Console cable — RJ-45 to DB-9
Grounding wire
Power Cord — either Japan, US, Continental Europe, or UK
Four adhesive foot pads
Documentation — Quick Start Guide and Regulatory and Safety Information
Documentation CD — includes Installation Guide and Management Guide