User's Manual

GPR4 Utility Scanner
User Manual
D
-
000002
-
000023
October
9
,
2019
Copyright © 2019 ESS, LLC. All rights reserved.
Page 14 of 27
c. Local Frame Parameters Select the distance Units (feet or meters). Enter the
bearing of the first survey line in the Line 1 Azimuth field. The software will use
this value to correctly orient images on maps that are exported as KMZ or HTML
files.
8. Move the scanner to the start position of the line. Press the Previous line button
until the proper line number is displayed at the top of the screen. This action can also be
accomplished by pressing the rocker button on the radar unit to the left momentarily.
Each time this button is pressed, the system runs through a line initialization sequence
which tasks a few seconds. When the user hears an audible beep from the tablet, the
initialization sequence has completed. Therefore, users should wait until the audible
beep is heard before another line request.
9. The GPR data can be recorded for later playback and examination if desired. When
locating intersecting conduits, some users may choose not to record the data. Select
File, New, and then choose a location and name for the database file. When ready to
begin the survey, press the Record data button . This action can also be
accomplished by pressing the rocker switch on the radar unit up momentarily. The
button should appear activated to indicate that data are being recorded. Move the cart
along the survey line to conduct the survey.
10. Move the cart along the survey line until the scanner moves beyond the object of
interest. Roll the scanner backwards on the line until the scanner is positioned directly
over the object and mark the position on the surface with a marker. While recording
data, a marked fiducial can be placed in the datafile by pressing the icon.
11. If data recording was enabled, press the Record data button to turn off recording
after the cart has traversed the entire survey line. The button should appear inactivated.
12. If no further surveys are to be conducted, power down the sensor and odometer.
Disassemble the survey cart and return all components to the shipping case.
5.3 Conduct a 3D Survey
Users usually conduct 3D scans when depth slices or 3D views of the subsurface are
desired. To conduct a 3D survey, proceed as follows.
Figure 6. Jobsite information dialog.