INSTRUCTION MANUAL EAGLE PEAK PC GREENHOUSE 10 FT x 6 FT x 7 FT Thank you for choosing Eagle Peak !
CONTENTS 1. lmportant Read Before Assermbly ................................................................................................................................ 1 2. Dimensions & Specifications .......................................................................................................................................... 3 3. Part List ........................................................................................................................................................
IMPORTANT Warning! To reduce the risk of serious injury, read the following safety instructions before assembling and using the greenhouse. Please check with your local governing authority/local municipal codes regarding installation of structures before assembly. Caution! Proper placement of your greenhouse is essential. Do not place the product underneath or near electrical lines. Keep children away during assembly. This product contains small parts which can be swallowed by children.
IMPORTANT • Please read and understand this manual before any assembly. Before beginning assembly of the product, make sure all parts are present. Compare parts with packaging contents list. • Place all parts from the box in a cleared area and organize them for assembly. • Remove all packing materials and place them back into the box. Do not dispose of the packing materials until assembly is completed. • DO NOT tighten the screws before PC panel assembly in order to ensure all the parts fit with each other.
Dimensions & Specifications 58 cm 1.9 ft 31 10 2 cm .2 ft 207 c 6.8 m ft 138 c 4.5 m ft 19 6.
Part List Item NO. Size Quantity Item NO. Size Quantity Item NO. 1A 1215mm 47.8in 4X 5A 1830mm 72.0in 1X 1B 1130mm 44.5in 1X 6A 619mm 24.4in 1C 1130mm 44.5in 1X 7A 1D 1130mm 44.5in 1X 1E 1130mm 44.5in 2A Size Quantity 13A 1250mm 49.2in 1X 1X 14A 380mm 15in 1X 1830mm 72.0in 2X 15A 1600mm 63in 2X 7B 1300mm 51.2in 4X 16A 625mm 24.6in 2X 1X 7C 594mm 23.4in 2X 17A 625mm 24.6in 1X 1640mm 64.5mm 1X 7D 1300mm 51.2in 2X 18B 595mm 23.4in 4X 2B 1640mm 64.
Part List Item NO. Sketch Size mm 2 3 M6*40 4 Quantity Item NO. 1X Quantity Item NO. 18 2X 33 8X 25X 19 4X 35 226X 2X 20 2X 36 8X Size mm Sketch Sketch Size mm Quantity 5 M6*10 226X 21 1X 37 8X 6 M3*20 16X 22 2X 38 8X 7 M3*10 24X 8 4X 24 12X 9 2X 25 8X 10 2X 26 4X 11 1X 27-1 1830mm 72.0in 4X 13 4X 27-2 1220mm 48.
Part List Item NO. Sketch Size Qty Item NO. Sketch Size Qty A4 603x1210mm 23.75x47.63in 15X B4 603x1120mm 23.75x44.09in 6X D4 603x590mm 23.75x23.22in 4X E4 595x550mm 23.42x21.65in 4X F4 603x655mm 23.75x25.78in 1X G4 620x240mm 24.40x9.45in 1X H4 620x230mm 24.40x9.05in 1X I4 620x600mm 24.40x26.62in 2X X4 603x440mm 23.75x17.
Base Assembly Step 1 Parts required for this step 27-1 1830 1220 2X 27-2 28 4X 30 4X 31 10X 32 2X 24X 29 4X 3 4 M6*40 4X 2X IMPORTANT: The ground, wooden deck, or concrete surface must be firm and level for maximum stability and durability. If not, the PC board may not be properly secured in the provided guide rail and may be blown out by strong wind.
Step 1 3 1.2 1.3 28 1.4 1.5 27-1 30 1.1 31 27-2 28 1.2 1.3 32 31 1.4 1.5 27-1 1.2 1.3 31 27-2 1.1 27-1 19 6.2 0 cm ft 27-1 31 10 2 cm .2 ft 28 28 1.2 1.3 1.1 1.2 27-2 28 27-2 3 29 3 32 27-2/27-1 27-1/27-2 Corner Stakes are needed to set up in soil (Status 1) 30 27-1/27-2 1.3 27-2/27-1 28 3 Assemble the foundation frame using (2) 27-2 Beams, (1) 32 Middle Bracket, and (4) 3 Screws, Nuts and Washers. Repeat 1X.
Step 1 Assembly on Ground 1.3 30 1.4 27-1/27-2 31 Excavate the site by removing the top 3 in of grass or soil and leveling the base, allowing a 6 in perimeter around the foundation. Assembly on Wood or Concrete Pad 1.5 Build a level wood or concrete pad that is slightly wider and longer than the green house. DO NOT use Part 30 and 31 if set up on wooden deck or concrete ground.
Step 2 Vent Window Assembly Parts required for this step 18B 595 4X 19B 20B 595 4X 13 595*550 4X 5 E4 7 M3*10 8X 4 10 0 520 8X 4X M6*10 16X 2X
Step 2 Vent Window Assembly, cont’d 5 2.1 19B 20B E4 2.1 2.2 2.3 13 2.4 19B 18B 2.2 2.
Vent Window Assembly, cont’d Step 2 Repeat 4X Assemble (2) Frame piece 19B to (1) Frame piece 20B using (3) Screw Set 5. Do not tighten screws at this time. 2.1 5 20B 19B 20B 2.2 19B 5 ① 19B E4 5 ② 18B Slide Window E4 into the window frame. 2.3 2.4 13 19B 7 E4 5 E4 18B 18B Secure the vent window handle 13 to the window frame using (2) screw 7.
Door Assembly Step 3 Parts required for this step 11A 625 1X 12A 610 1X 15A 1600 2X 16A 625 2X 17A 625 1X 5 M6*10 2X M3*20 16X 4 13 2X
Step 3 Door Assembly, cont’d 5 3.1 3.1 12A 11A 15A 15A 3.2 3.2 16A 3.2 3.2 16A 3.3 3.3 17A Door pre-assembly for future step. PC Panels are not needed at this time.
Step 3 Door Assembly, cont’d Assemble Part 12A to Part 11A using (2) Screw, Washer and Nut 5. 3.1 Assemble Part 12A/11A to (2) Vertical Door Frames 15A using (4) Screws 6. 11A 5 12A 6 15A Assemble Part 16A to (2) Vertical Door Frames 15A using (4) Screws 6. 3.2 Repeat with second Part 16A as shown on Page 15A 16A 6 Assemble Part 17A to (2) Vertical Door Frames 15A using (4) Screws 6. 3.
Step 4 Front Wall Assembly Parts required for this step 1A 1215 2X 1B 1130 1X 1C 1130 1X 2A 1640 1X 2B 1640 1X 5A 1830 1X 6A 619 1X 7C 594 2X 7D 1300 2X 26 2X 5 M6*10 18X 4 2X 16
Step 4 Front Wall Assembly, cont’d 5 1C 4.6 4.6 1B 6A 4.4 26 26 4.5 4.5 7C 4.3 7C 2B 7D 2A 7D 1A 1A 5A 4.1 4.2 4.2 Front Wall pre-assembly for future step. PC Panels are not needed at this time. 17 4.
Step 4 Front Wall Assembly, cont’d 4.1 4.2 2A/2B 1A 7D 5 5A 5A 5 Assemble Part 7D to Vertical Frames 2B using (1) Screw, Washer, Nut 5. Repeat with 2A. Assemble Corner Support 1A to Bottom Frame 5A using (1) Screw , Washer, Nut 5. Repeat at opposite end. 1B 4.3 26 4.4 5 26 5 1A 7C 1C 1A 7C 7D 7D Assemble Parts 7C, 7D, 1A and 1C to Corner Bracket 26 using (4) Screw, Washer, Nut 5. Assemble Parts 7C, 7D, 1A and 1B to Corner Bracket 26 using (4) Screw, Washer, Nut 5. 4.5 7C 4.
Attach the Door Step 5 Parts required for this step 13A 1250 2 3 4 M6*40 1X 14A 1X 11 1X 5 2X 19 380 1X 1X M6*10 4X
Step 5 Attach the Door, cont’d 3 13A 1B 5.3 14A 5.4 5.1 5.2 5 1C 2 5.
Step 5 Attach the Door, cont’d 5 5.1 5.2 1B 13A 13A Slide (3) Screw 5 into the channel on upper Door Channel 13A. 5 6A 5 Attach Door Channel 13A to parts 6A and 1B using two of the three Screw 5. 5.3 5.4 13A 1B 3 2 14A 14A 5 Attach the top of Vertical Support 14A to the end of 13A using the remaining Screw 5. 5.5 Attach the bottom of Vertical Support 14A to Roof Beam 1B using Screw 3. Make sure to use Spacer 2 as shown. 13A 11 5 Slide the Door Frame assembly onto the Front Panel Assembly.
Step 6 Side Wall Assembly Parts required for this step 3C 1215 4X 4C 1220 1X 4F 1830 1X 7B 1300 2X 8B 1220 1X 8D 1830 1X 1X 22 1X 35X 4 2X 20 5 M6*10 22
Step 6 Left Wall Assembly, cont’d 5 8B 8D 6.5 6.7 6.3 6.5 20 5 5 6.7 6.5 5 5 7B 6.9 7B 6.9 3C 3C 3C 3C 4F 6.2 6.6 6.8 6.1 6.6 6.2 6.4 5 6.1 6.2 Slide (5) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 1X. 8B 20 5 3C 4D 22 5 Slide (4) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 1X. 8B 8D 6.8 3C 3C 6.3 6.1 6.6 Connect Horizontal Beam 8D and 8B with Connector 20 using (4) Screw 5.
Step 6 Left Wall Assembly, cont’d 6.4 6.5 6.6 4D 3C 8D/8B 3C 4F 5 22 4F/4D 5 3C 5 Connect Horizontal Beam 4F and 4D with Connector 22 using (4) Screw 5. Attach the bottom of Vertical Wall Support 3C to Horizontal Beam 4F/4D using the Screw 5 nearest the end of part 3C. 6.7 Attach the top of Vertical Wall Support 3C to Horizontal Beam 8D and 8B using the Screw 5 nearest the end of part 3C. Repeat 2X. 6.
Step 7 Right Wall Assembly Parts required for this step 3C 1215 4X 4C 1220 1X 4E 1830 1X 7B 1300 2X 8C 1220 1X 8E 1830 1X 1X 22 1X 35X 4 2X 20 5 M6*10 25
Step 7 Right Wall Assembly, cont’d 5 8E 8C 7.5 7.7 7.5 7.3 20 5 5 7.7 7.5 5 5 7B 7.9 7B 7.9 3C 3C 3C 3C 4C 7.2 7.4 7.8 7.1 7.6 7.2 7.6 7.2 Slide (5) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 1X. 8E 20 5 3C 5 Slide (4) Screw 5 into the channel of Vertical Wall Support 3C. Repeat 1X. 8E 8C 4E 3C 3C 7.3 7.1 7.6 22 5 7.1 7.8 Connect Horizontal Beam 8C and 8E with Connector 20 using (8) Screw 5.
Step 7 Right Wall Assembly, cont’d 7.4 7.5 7.6 4E 3C 8C/8E 3C 4C 5 22 4C/4E 3C 5 Connect Horizontal Beam 4C and 4E with Connector 22 using (4) Screw 5. Attach the bottom of Vertical Wall Support 3C to Horizontal Beam 4C/4E using the Screw 5 nearest the end of part 3C. 7.7 5 Attach the top of Vertical Wall Support 3C to Horizontal Beam 8C and 8E using the Screw 5 nearest the end of part 3C. Repeat 2X. 7.
Step 8 Back Wall Assembly Parts required for this step 1A 1215 2X 1E 1130 1X 1D 1130 1X 3A 1665 1X 3B 1665 1X 4B 1830 1X 7A 1830 1X 26 2X 5 M6*10 18X 4 2X 28
Step 8 Back Wall Assembly, cont’d 5 8.5 .5 8.5 1D 1E 8.6 8.4 8.6 7A 26 1A 8.1 .1 8.1 8.4 .4 26 3A 3B 1A 4B 8.2 .3 8.3 8.3 8.2 .2 Back Wall pre-assembly for future step. PC Panels are not needed at this time.
Step 8 Back Wall Assembly, cont’d 8.1 8.2 1A 5 5 4B 3A/3B Slide (5) Screw 5 into the channel of Vertical Wall Support 3A and 3B. Attach Corner Vertical Support 1A to Horizontal Beam 4B using (1) Screw Set 5. Repeat on opposite end with remaining Vertical Support 1A. 8.3 1D/1E 8.4 3A/3B 26 4B 5 1A 7A Attach Vertical Supports 3A and 3B to Horizontal Beam 4B using the lowest Screw 5 inserted in step 7.1.
Step 9 Roof Ridge Beam Assembly Parts required for this step 9B 1220 19 5 M6*10 1830 1X 9C 4X 21 1X 12X 4 2X 31 1X
Step 9 Roof Ridge Beam Assembly, cont’d 5 1E 1D 9B 9.2 9.1 9C 1B 1C 9.1 9.1 1B/1C 1D/1E 9.2 9B 9B 21 19 5 9C Insert Plug 19 into the ends of Diagonal Roof Braces 1B, 1C, 1D, and 1E. 9C Connect (2) Roof Ridge Beam 9B and 9C with Connector 21 using (4) Screw 5.
Step 10 Joining the Walls Parts required for this step 29 12X 5 M6*10 16X 2X 4 5 10.8 9B 9C 10.8 10.2 10.3 10.5 10.1 10.6 10.7 10.1 10.6 10.5 10.5 33 10.4 10.
Step 10 Place the Right Wall Assembly and Back wall Assembly on the Foundation Assembly with the help of an assistant. 10.1 1A 5 4C/4D 4E/4F Attach the bottom of Vertical Support 1A to the end of Bottom Horizontal Beam 4D and 4E using (1) Screw 5 Set. Attach Horizontal Beam 8B and 8C to Vertical Support 1A and Diagonal Roof Beam 1D and 1E using (2) Screw 5 Sets. Repeat with Left Wall Assembly. 10.2 1D/1E 1D/1E 5 8B/8C 8B/8C 1A 10.
Step 10 10.4 10.5 27-1 3C 27-1/27-2 3A/3B/3C 27-2 5 5 29 29 32 27-1 Secure Wall Assemblies to the Foundation Assembly by removing the required nuts and washers, installing (10) Clip 29, and replacing the nuts and washers as shown. 10.6 10.7 1A 29 5A 2A/2B 5 5 29 Remove the nut and washer from the lower corner, install Clip 29 to attach the corner of the frame to the foundation. Repeat on all lower corners.
Step 11 Installing the Roof Rafters Parts required for this step 3D 1115 8X 24 12X 5 M6*10 48X 4 1X 36
Step 11 Installing the Roof Rafters, cont’d 5 9B 9B Slide Slide the two Vent Panel Assemblies into the channel on Ridge Beam 9B as shown. 11.5 11.6 11.3 11.6 11.5 11.6 9B 3D 3D 3D 3D 3D 24 24 11.1 11.4 11.7 11.1 11.4 11.7 37 11.1 11.2 11.
Step 11 Installing the Roof Rafters, cont’d 11.1 11.2 3D 5 8E/8B 8C/8D 3D 20 5 Attach the lower end of Roof Rafter 3D to Sidewall Horizontal Beam 8B and 8D using the lowermost Screw 5. Repeat 1X. Slide (6) Screw 5 into the channel on (3) Roof Rafter 3D. 11.3 11.4 9B 3D 9C 5 21 3D Attach the top end of Roof Rafter 3D to Roof Ridge Beam 9B and 9C using the uppermost Screw 5. Repeat 1X. 9B/9C 11.5 11.
Step 12 Installing the Panel Supports Parts required for this step 7A 1830 1X 7K 10A 635 4X 25 7 M3*10 16X 5 4 1X 39 625 20X 8X M6*10 10X
Step 12 5 12.2 7K 7A 10A 12.1 12.2 7K 12.3 12.1 3D 7K 7K 7K 7K 12.5 12.7 7K 7K 7K 12.3 12.5 12.6 12.1 12.4 12.2 3D 10A 7 7 25 10A 25 Install (2) T Braces 25 on Vent Support 10A using (4) Screw 7. Repeat 3X. 40 5 Attach Vent Support 10A to Roof Rafters 3D using (2) Screw 5. Align with lower edge of the Vent Panels and tighten. Repeat 3X.
Step 12 12.3 12.4 7K 5 1B/1C 1D/1E 7K 7K 5 3D Attach (5) Horizontal Panel Supports 7K to Diagonal Roof Beam 1B, 1D and Roof Rafters 3D using (6) Screw 5. Repeat on opposite side. 12.5 12.6 7K 5 7K 7K 1A 5 3C Attach 5) Horizontal Panel Supports 7K to Vertical Wall Supports 1A and 3C using (6) Screw 5. Repeat on opposite side. 12.7 5 7A 1A Attach (3) Horizontal Panel Supports 7A to Vertical Wall Supports 1A, 3A , and 3B using (4) Screw 5.
Set up the PC Panels Parts required for this step A4 603*1210 15X B4 603*1120 6X D4 603*590 4X F4 603*655 1X G4 620*240 1X H4 620*230 1X I4 620*600 2X X4 603*440 4X 14 234X 21A 603 5X 17 76X 42
PC Panel Rear A4 A4 B4 D4 A4 A4 A4 A4 X4 F4 X4 E4 B4 E4 B4 A4 D4 A4 B4 A4 H4 A4 D4 A4 E4 X4 B4 A4 I4 G4 X4 E4 D4 A4 B4 A4 A4 I4 Side Roof Roof Side Front Notes: 1. Peel approximately 2 inches of film from all sheet edges before installing. Remove all film immediately after the constructions completed. 2. The UV-protected side of the sheet is covered with opal white film and must face towards the sun.
Installing the PC Panels Step 13 Use of a ladder may be necessary to reach the top of the greenhouse. The sides of the panels are secured using the Spring Clips 14. To place the clips insert one end into the frame channel. Then, capture the panel in the center of the clip as shown below. Lastly, insert the remaining end of the clip into the channel. The ends of the panels are secured to the frame using Clip 17 as shown. Use (2) clips per short side.
Installing the PC Panels, cont’d Step 13 13.4 F4 E4 X4 B4 X4 E4 A4 E4 D4 B4 A4 A4 X4 G4 I4 A4 A4 I4 A4 D4 B4 B4 H4 21A 21A X4 E4 13.7 21A A4 21A A4 13.2 A4 A4 13.5 13.1 13.6 14 45 13.
Installing the PC Panels, cont’d Step 13 13.1 13.2 X4 X4 21A 21A A4 A4 14 14 17 5A 4B 13.
Installing the PC Panels, cont’d Step 13 13.5 13.4 9C/9B 14 10A 16A I4 B4 16A G4 D4 I4 17 8D/8B 17 14 8C/8E 17A 13.6 17 A4 1C 14 13.
Step 14 Installing the Accessories Parts required for this step 8 4X 9 2X 10 2X 15 4X 16 8X 18 2X 33 8X 35 226 48
Step 14 Installing the Accessories, cont’d 14.3 14.1 14.4 14.4 14.3 14.4 14.2 14.4 14.1 49 14.
Step 14 Installing the Accessories, cont’d 14.1 14.2 10 8B/8C 9 8B/8C ATTENTION You may need a slotted screwdriver when you are assembling plug 10 & 9 8 1A 8 1A 16 16 15 15 14.4 14.
Anchor the Base 36 38 37 36 38 37 A drill will be needed to anchor the greenhouse to concrete. 36 27-1/27-2 38 A drill will be needed to anchor the greenhouse to wooden deck.
Open and Close The Vents Attention: Make sure the vent is in the correct position before closing it.
Additional Strength Advice You can also glue the polycarbonate panel to the aluminum frame to enhance the stability using silicone sealant. Note Silicone sealant and caulking gun are not included in our tool kit. You can buy them locally. Only use the silicone sealant suitable for aluminum.