Installation Sheet

MAL_Ketho_KT6664/16.12.1
1 2 3
4
5 6 7
Reference the washbasin
specification to establish the
position of mounting bolts,
mark the holes to be drilled for
the anchors.
Using a 3/8“ and 5/8“ drill bit,
drill the anchor holes that
have been marked.
The plastic anchors provided
are for concrete wall
applications.
For wood stud walls, bolts should
be screwed into wood backing.
When mounting the washbasin
into a wood stud wall, there
must be adequate bracing. We
recommend doubling up 2 x 6’s
or 2 x 8’s between the studs to
form a solid anchoring point.
Screw mounting bolts into the
pre drilled holes with an
adjustable wrench. Screw in
the full length of the mounting
bolt, so that the lag thread is
no longer visible. Carefully slide
washbasin onto the mounting
bolts. Insert the white plastic
sleeve over bolt and into the
hole in the washbasin. Install
provided washer and nut.
Hand tighten the nut,
so the washbasin is secure.
Install the siphon.
Remove the vanity drawer. Using a screwdriver, adjust
the vanity mounting hinge
system clockwise.
8
Slide the vanity under the
washbasin.
Tighten mounting bolts with a
wrench until the washbasin
is stable.