MIRAGE-X / BELLA Shower Door Installation Instructions IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to your model’s web page on DreamLine.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
Tools Level Power Drill Tape Measure Hammer Pencil Phillips Screwdriver Miter Saw or Hacksaw Drill bit (D=8mm) (D=5/16") Drill bit (D=3mm) (D=1/8") Caulk NOTE: Unpack your unit carefully and inspect it. Lay it out and identify all parts using the detailed diagram and packing list in your manual as a reference. Before discarding the carton, check for small hardware bags that may have fallen to the bottom of the box. If any parts are damaged or missing, please contact DreamLine® for replacement.
Parts diagram Right hand L-Bracket Left hand L-Bracket 6 7 5 8 1 9 2 10 11 12 13 4 14 15 3 16 17 18 19 20 21 Parts List # ITEM Qty # ITEM Qty 11 Stopper 1pc 1 Stationary Glass 1pc 12 Bottom Rail Insert 1pc 2 Glass Door 1pc 13 Bumper Seal Strip 1pc 3 Bottom Guide Rail 1pc 14 0.5mm Bottom Spacer Strip 1pc 4 Handle (200mm centers) 1pc 15 Allen Wrench 2.5mm,3mm 5 L- Bracket (Left or Right) 1pc 16 Round Head screw ST4.
Assembly diagram 5 9 4 11 10 MIRAGE-X / BELLA manual Ver 1 Rev 2 07/2016 5
Installation steps 1. Measure the finished opening at the top, middle and bottom. The bottom width dimension will be “W”. Also check the threshold for level and the walls for plumb. Note that this model does not have adjustment for out-of-plumb conditions. See Fig 1 for details Fig 1 2. Subtract 1/16” from your “W” dimension. (W-1/16” = L) “L” = finished cut length. Use a miter saw or hack saw to cut your Bottom Guide Rail (#03) to the finished cut length “L”.
3. Position your Bottom Guide Rail (#03) onto the threshold and mark its position. Use a tape measure to keep it parallel with the threshold. See Fig 3 for details 4.
5. Remove the temporary screw from the stopper hole in the Bottom Guide Rail (#03) and install the Rubber Stopper Block (#11) onto the Bottom Guide Rail (#03) on the stationary panel side using the pre-drilled Ø1/8” hole and attach using the ST4.2 x 20 screw (#08). (Left hand installation shown). Cover the screw with the supplied rubber plug. See Fig 5 for details Fig 5 6. Position the Wall Profile (#17) against the wall for the stationary panel installation and make it plumb using a level.
7. Mark the Wall Profile’s (#17) position on the wall and also mark the hole locations for drilling. Remove the Wall Profile (#17) and drill Ø5/16”(6mm) holes into the wall. Insert the Wall Anchors (#06). Apply a bead of silicone to the wall or to the back of the Wall Profile (#17). Attach the Wall Profile (#17) to the wall using the ST4.2 x 40 screws (#07). 1 3 2 Ø5/16” (8mm) 5 4 See Fig 7 for details Fig 7 8. Cut the 0.
9. Apply silicone to the inside of the Wall Profile (#17) and into the Bottom Guide Rail(#03) equal to the width of the glass. See Fig 9 for details Caulk Gl as s Fig 9 Caulk 10. Install the Stationary Glass (#01) into the Wall Profile (#17) and Bottom Guide Rail (#03) See Fig 10 for details NOTE: The Wall Profile (#17) will allow for up to 3/8” out-of-plumb. Use a level on the Stationary Glass (#01) to confirm that it is installed plumb and level.
5 5.4 5.3 5.2 5.5 5.6 5.1 5.7 5.8 L-Bracket Assembly (#05) components 5.1 Rubber pad 1pc 5.2 M5 rubber tip set screw 2pcs 5.3 L-Bracket 1pc 5.4 Decorative cover 1pc 5.5 Wall Anchor 6pcs 5.6 1pc 5.7 Wall Plate ST4.2x40 5.
11. Position the L-bracket assembly (#05) onto the Stationary Glass (#01) as shown and mark the position. Remove the Wall Plate (#5.6) and mark the holes for drilling Ø5/16”(8mm) holes and insert the wall anchors. Attach the Wall Plate (#5.6) using ST4.2 x 40 (#5.7) screws. Re-attach the L-Bracket (#5.3) to the Wall Plate (#5.6) and adjust the angle if necessary using the set screws (Fig 11.7& 11.8). Adjust (+/- 3/16” (4mm) ) the Stationary Glass (#01) to plumb and tighten the screws.
Roller Assembly (#10) components / pair 10.1 Roller body (exterior) 2pcs 10.2 Rubber pad 1 4pcs 10.3 Rubber pad 2 2pcs 10.4 Bearing 2pcs 10.5 Eccentric shaft 2pcs 10.6 M5x14 Allen Bolt 8pcs 10.7 Cover plate 2pcs 10.8 Decorative board 2pcs 10.9 M5x16 Allen Bolt 2pcs 10.9 10 10.8 10.7 10.1 10.2 10.3 10.4 10.5 10.6 12. Attach the Roller Assemblies (#10) to the door glass. Make certain that the wheels are facing the correct way and that they are installed squarely onto the glass.
13. Set the Glass Door (#02) with the attached Bottom Roller assemblies (#10) onto the Bottom Guide Rail (#03). See Fig 13 for details Fig 13 NOTE: You will need an assistant to hold the door glass in position during the next steps until the door is secured in position with the Guide Block Assembly (#09).
9 9.8 1 9.7 9.6 9.5 9.4 9.1 9.2 9.3 2 9.1 9.2 Exterior Slider Bracket (for panel) 1pc 2pcs Gasket 9.3 Rubber sleeve 2pcs 9.4 Shaft 2pcs 9.5 Sliding pad 1pc 9.6 Sliding Guide Block (for door) 1pc 9.7 M5x10 set screw 2pcs 9.8 M4x4 flat head screw 2pcs Fig 14 14. Attach the Exterior Slider Bracket (#9.1) through the notch of the installed Stationary panel glass (#01) as shown in Fig 14.1, using the Gasket (#9.2) and Rubber Sleeves (#9.3).
15. Install the Handle (#04) to the outside of the Door Glass (#02).(Fig 15.1) Attach the Bumper Seal Strip (#13) to the closing edge of the Door Glass (#02). (Fig 15.2) Apply silicone into the Bottom Guide Rail (#03) and install the Bottom Rail Insert (#12) (Fig 15.3). 1 See Fig 15 for details 2 door Fig 15 3 Trim the insert to: W-1/16” Fig 16 W 16. Measure from the edge of the panel glass to the wall and cut the Bottom Rail Insert (#12) to this dimension: W-1/16”.
. Adjust the Bottom Rollers (#10) as shown. The door should operate smoothly and create a good seal with the wall. Loosen the Allen Bolt and then rotate the adjusting disk using the Roller adjustment tool (20) as shown. Hold the door glass in the desired position and re-tighten the allen bolt. See Fig 17 for details 1 2 Fig 17 1/16” 3/16”(4.5mm) MIRAGE-X / BELLA manual Ver 1 Rev 2 07/2016 max. 1/4”(6.5mm) 1/16” min.1/16”(2.
. Attach the roller Cover Plate (#10.8), leaving approximately 1/16” of clearance beneath the bottom rail. Re-adjust if the plate makes contact with the bottom rail.
. Remove the paper strip from the adhesive backing of the Deflector (#18) and attach all three strips to the bottom edge of the door glass as shown. Attach the Anti-water side strip (#19) to the edge of the door glass. (Notch off the inside bottom to fit around the Deflector (#18)).
. Apply a good quality mildew-resistant silicone along the wall profile and bottom rail. Allow 24 hours for the silicone to fully cure before first use.
Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic back walls: wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. GLASS: To ensure long lasting life for your glass shower products: wipe them off after each use with a soft cloth.
TEL: 866-731-2244 FAX: 866-857-3638 For more information on DreamLine® Shower Doors and Enclosure please visit DreamLine.