Installation Guide

Preparation
NOTE: DO NOT install the handle onto the door glass until instructed to do so. DO NOT attempt to
lift the glass using the handle. This could result in damage to the glass and/or serious personal injury.
Always use an assistant or a professional grade glass suction cup when handling heavy glass.
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with your packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the needed parts are included in the package by checking off the components on
the “Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a finishing
defect, or has missing parts, please contact our customer support department within 3 business days
of the delivery date. Please note that DreamLine
®
will not replace any damaged products or
missing parts free of charge after 3 business days or if the product has been installed. Feel free
to contact DreamLine
®
if you have any questions, and please provide an order number, job name or
other proof of purchase to help us identify your original order.
2. Please note that you should consult your local building codes with questions on installation
compliance standards. Building and plumbing codes may vary by location, and DreamLine
®
is
not responsible for code compliance standards for your project and will not accept any returns.
3. If this unit is going to be installed in a new construction, please install all of the required plumbing
and drainage before installing the shower. Use a competent and licensed (if required by local code)
plumber for all plumbing installation.
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and will
be able to support the total weight of the unit. Also make sure the walls are at right angles. Irregular
installation surface level, radius corners or improper angle of side walls will result in serious problems
for your installation. Note that some adjustments and drilling will be necessary during the installation
process.
5. Please protect all primary surfaces of the product during installation. Never set the glass down
directly onto a tile floor. Leave corner protectors in place until it is necessary to remove them.
Always use a piece of wood or cardboard to protect the bottom edge and corners of the glass prior
to and during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. The hinge panel glass for this model should not be adjusted more than 1/4” for
out-of-plumb within the U-channel. This model does NOT have any adjustment for overall width.
Verify that the model size ordered will fit the finished opening before begining installation.
8. This model requires that you drill into the threshold for proper installation.
9. It is recommended to install the hinge-side U-channel into a stud.
10. This model requires minimum 5/8” of flat threshold space for installation.
Professional installation recommended
6
UNIDOOR-X (STYLE M) manual Ver 2 11/2016
!
©2017 DreamLine. All Rights Reserved