Installation Guide
Table Of Contents
“UNIDOOR (STYLE G)” Ver 1 Rev 6 09/2016
9
4. Slip the cut U-channel 2 (bottom profile) (29) and
U-channel 1 (wall profile) (09) onto the Stationary
glass (11) in the shown locations.
With the door open, place the Stationary glass on
the half wall ledge opposite of door. Adjust the
Stationary glass and U-channel 1 (wall profile)
against the wall to compensate for any out of plumb
conditions ensuring that the Stationary glass is level
vertically and U-channel 1 is flush with the wall.
NOTE: The exposed vertical glass edge must be
flush with the finished half wall’s door side face.
Mark the U-channel 2 (bottom profile) end
opposite of the wall at the exposed vertical glass
edge.
Remove the U-channel 2 (bottom profile). Leave
the U-channel 1 (wall profile) on the Stationary
glass. Set the Stationary glass aside.
Cut the U-channel 2 (bottom profile) at the mark.
Slip the U-channel 2 (bottom profile) back onto
the Stationary glass.
See Fig. 5 for details.
wall
inside
inside
Stationary
glass
U-channel 2
U-channel 1
wall
inside
Fig. 5
1
3
5
2
4
6
H (+) 1"
b)
Fig. 4
©2017 DreamLine. All Rights Reserved