Installation Guide

“UNIDOOR (STYLE G)” Ver 1 Rev 6 09/2016
4
Preparation
1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece
count with your packing slip. After opening all boxes and packages read this introduction carefully.
Check that all of the needed parts are included in the package by checking off the components on
the Detailed Diagram of Shower Door Components”. If the unit has been damaged, has a
finishing defect, or has missing parts, please contact our customer support department within
3 business days of the delivery date. Please note that DreamLine
®
will not replace any
damaged products or missing parts free of charge after 3 business days or if the product has
been installed. Feel free to contact DreamLine
®
if you have any questions and please provide an
order number, job name or other proof of purchase to help us identify your original order.
2. If this unit is going to be installed in a new construction, install all of the required plumbing and
drainage before installing the shower. Use a competent and licensed (if required by local code)
plumber for all plumbing installation.
3. Please note that you should consult your local building codes with questions about
installation compliance standards. Building and plumbing codes may vary by location, and
DreamLine
®
is not responsible for code compliance standards for your project and will not
accept any returns.
4. Please make sure that prior to beginning the installation, the surfaces are leveled and solid and will
be able to support the total weight of the unit. Also make sure the walls are at right angles.
Irregular installation surface level, radius corners or improper angle of side walls will result in
serious problems for your installation. Please note that some adjustments and drilling may be
necessary during the installation process.
5. Please protect all primary surfaces of the product during installation. Never set your glass down
directly onto a tile floor. Leave corner protectors in place until necessary to remove them. Always
use a piece of wood or cardboard to protect the bottom edge and corners of the glass prior to
and during installation.
6. This unit must be installed upon a finished threshold and against finished walls.
7. This model requires that you drill into the threshold for proper installation.
8. This model has 1/2” of adjustment within the u-channel for out-of-plumb wall conditions and
overall width within the model size. Confirm the finished opening conditions before proceeding
with the installation.
9. This model requires a minimum 5/8” of flat threshold space for installation.
10. Professional installation is recommended for this heavy glass frameless shower door.
NOTE: This door is reversible for right or left side panel installation. The right side panel installation is
shown as an example throughout this manual. For the left side panel installation, simply begin on the
opposite wall and reverse the orientation of the steps shown.
©2017 DreamLine. All Rights Reserved