Hardware List Back side rail 1p.
STEP 1: Fashionable monotonous scatty FAVES, [1] 5 STEP 3: Colonnade ion losing Assoc FAVE, [J A [3] Tuning hardware #1 & #4 connect A and B Fran-back left leg with E har zonal (lower) 8 Using hardware connect FRAME #1LR Lamplight leg frame) with § 8 And using hardware #1 & #4 connect C and D Front-back right leg with E horizontal (upper) he G and H Side mil to complete FRAME #3. v to complete FRAME $118.
0 BPS | PCS Fes i il i jel C52 ia Bi £1 GEE Using hardware #1 & #4 connect the Cap M And using hardware #1 & #4 manna Top bar of urns! P with N and O St 10 complaint FRAME £6. STEP 5: Footing bot ow illustration asses NOTE: in this step, DO NOT tighten any bot until you connect al part together STEP 8: Footing bola ration Assembly FRAME #8. Ova the FRAME #4 to put on the leg A,B, G end Callaghan A,B,C Using hardware #4 connect ‘and with F horizontal (upper) i complete FRAME #6.
STEP 9: Following below aspiration Passably FRAME #9.