Setup Guide

Table Of Contents
Figure 10. Switch rails attachment
2. After you have installed both switch rails, line them up on the previously mounted Ready-Rails and slide the switch in until it
is flush with front of rack.
About 3 inches before you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently
sliding out of the rack and falling.
NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace.
Figure 11. S4048-ON front-rack configuration
S4048ON installation
21