Users Guide

Rack Installation Guide 9
Figure 1-1. Rack Kit Contents
Installation Tasks
NOTE: Follow the steps for installing a Cable-Management Arm (CMA) if you
ordered a CMA with your system. If you did not order a CMA, Dell recommends that
you retain the documentation for installing this feature in the event that you choose
to order a CMA at a later time.
Installing a rack kit involves performing the following tasks (described
in detail in subsequent sections) in their numbered order:
1
Removing the rack doors
2
Marking the rack
3
Configuring the sliding rail assemblies
4
Installing the mounting rails in the rack
RapidRails installation
VersaRails installation
1 cable-management
arm (optional)
2 left cable-management
arm ramp assembly
3 right cable-
management arm ramp
assembly
4 slide assemblies 5 10-32 x 0.5-inch flange-
head Phillips screws (8)
6 status indicator cable
(if applicable)
1
6
423
5