Owners Manual
Table 29. Cable routing for LSI 2008 SAS mezzanine card
Item Cable From (LSI 2008 SAS
mezzanine card)
To (system board)
Mini-SAS/SGPIO cable Mini-SAS connector 4-7 (J4) SAS/SATA input connector 4
and SAS/SATA input connector
5
Mini-SAS cable Mini-SAS connector 0-3 (J3) Mini SAS HD connector 0-3
3 Press down on the cables, and ensure the cables are routed lower than the height of the CPU heat sinks.
Figure 49. Cable routing down for LSI 2008 SAS mezzanine card (1U node)
Removing the 1GbE mezzanine card
Prerequisites
CAUTION
: Many repairs may only be done by a certied service technician. You should only perform troubleshooting and simple
repairs as authorized in your product documentation, or as directed by the online or telephone service and support team.
Damage due to servicing that is not authorized by Dell is not covered by your warranty. Read and follow the safety instructions
that are shipped with your product.
NOTE: The 1GbE mezzanine card is seated in PCI-E Gen3 x8 mezzanine slot 3 on the system board, which is not active in a one
processor conguration. See the C6320 system board connectors section.
1
Follow the safety guidelines listed in the Safety instructions section.
2 Turn o the system, including any attached peripherals.
3 Disconnect the system from the electrical outlet and disconnect the peripherals.
4 Remove the system board assembly.
5 Disconnect all the cables from the 1GbE mezzanine card.
Steps
1 Remove the screws that secure the expansion card bracket.
2 Lift the expansion card bracket out of the system board assembly.
Installing and removing system components
97