Owner's Manual

50 Setting Up an iSCSI Cluster
NOTE: It is recommended to use two Gigabit Ethernet switches. In the event of a
switch failure in a single Ethernet switch environment, all hosts lose access to the
storage until the switch is physically replaced and the configuration restored. In
such a configuration, there must be multiple ports with link aggregation providing
the inter-switch, or trunk connection. From each of the control modules, it is
recommended to connect one Gigabit interface to one Ethernet switch, and to
connect the other two Gigabit interfaces to the other Ethernet switch.
Figure 6-1. Recommended Network Configuration
Figure 6-2 is an architectural overview of a sample Oracle
Real Application
Cluster (RAC) configuration with three Dell|EqualLogic PS6000XV arrays.
The Dell|EqualLogic PS6000XV storage arrays provide the physical storage
capacity for the RAC database. The group oracle-group includes three
Dell|EqualLogic PS6000XV members: oracle-member01, oracle-member02,
and oracle-member03. When a member is initialized, it can be configured
with RAID 10, RAID 5, or RAID 50.
High-Bandwidth Inter-Switch Link
PowerConnect 6200 Gigabit
Ethernet Switches for iSCSI SAN
Dell|EqualLogic PS6000XV iSCSI Storage Array
Control Module 0
Power Supply and
Cooling Module 0
Control Module 1
Power Supply and
Cooling Module 1
iSCSI SAN
PowerConnect 6200 Gigabit
Ethernet Switches for iSCSI SAN
Lnx_Stnwt.book Page 50 Wednesday, August 4, 2010 11:58 AM