Manual

OneCommand™ Manager Application P010066-01A Rev. A
13. Diagnostics
LightPulse FC HBA Diagnostics
269
3. Click Start Tests.
Figure 13-5 D_Port Tests window
D_Port Window Descriptions
D Port Window Field Definitions
Overall Test Result – Displays PASSED or FAILED depending upon the
outcome of all the test phases.
Frame Size – The size of the frames used in each test phase.
Frame Count – The number of frames generated during each test phase.
Roundtrip Link Latency – Estimated cable length calculated by switch during
the execution of all tests.
Estimated Cable Length – Estimated cable length calculated by switch during
the execution of all tests.
D_Port Window Test Phase Results List
Test Phase – The name of the test run.
Phase Result – The result of the test run. Possible results are Pass, Fail, or
Skipped.
Phase Latency – The round trip legacy (in ns.) calculated during the execution of
the test.
Local Error – The error(s), if any, detected on the local side of the test.
Remote Error – The error(s), if any, detected on the remote side of the test.
D_Port Window Buttons
Start Tests – Click to start D_Port tests. The start time is displayed.
Stop Tests – Click to stop running D_Port tests. The stop time is displayed.
Save Results to File - Click to save test results to a file you specify.