Administrator Guide

Apr 3 00:41:02: %PE200-UNIT2-M:CP %CHMGR-0-PS_UP: Power supply 0 in unit 2 is up
Apr 3 00:41:02: %PE200-UNIT2-M:CP %CHMGR-5-PEM_REMOVED: Power entry module 1 of unit
2 is absent
Apr 3 00:41:02: %PE200-UNIT2-M:CP %CHMGR-5-FANTRAY_INSERTED: Fan tray 0 of Unit 2 is
inserted
Apr 3 00:41:02: %PE200-UNIT2-M:CP %CHMGR-2-SYSTEM_READY: System ready
Apr 3 00:41:02: %PE200-UNIT2-M:CP %CHMGR-4-TEMP_STATUS_CHANGE: Unit 2 temperature
state changed to 1 (Current temperature 36C).
Apr 3 00:41:02: %PE200-UNIT2-M:CP %SEC-5-LOGIN_SUCCESS: Login successful on console
Apr 3 00:41:03: %PE200-UNIT2-M:CP %IFMGR-5-ASTATE_UP: Changed interface Admin state
to up: Po 257
Apr 3 00:41:03: %PE200-C1048P:2 %IFAGT-5-INSERT_OPTICS_PLUS: Optics SFP+ inserted in
slot 2 port 1
Apr 3 00:41:03: %PE200-C1048P:2 %IFAGT-5-UNSUP_OPTICS: Non-qualified optics in slot 2
port 2
Apr 3 00:41:03: %PE200-UNIT2-M:CP %IFMGR-5-OSTATE_UP: Changed interface state to up:
Te 2/1
Apr 3 00:41:03: %PE200-UNIT2-M:CP %IFMGR-5-OSTATE_UP: Changed interface state to up:
Te 2/2
Apr 3 00:41:23: %PE200-UNIT2-M:CP %IFMGR-5-OSTATE_UP: Changed interface state to up:
Po 257
Apr 3 05:55:02: %PE200-UNIT2-M:CP %EVL-6-EVENT_LOGGING: Start uploading pre-recorded
traps(count:15) to CB
Apr 3 05:55:04: %PE200-UNIT2-M:CP %EVL-6-EVENT_LOGGING: Completed uploading pre-
recorded traps(send count:15, pending traps:0) to CB
Dell#
Dell#show pe brief
-- Port Extenders Information --
----------------------------------------------------------
PE-id Status Stack-size Type System-MAC
----------------------------------------------------------
200 online 1 C1048P f8:b1:56:00:02:8a
Dell#show pe 200
Codes: A - Active, I - Inactive
SVC - Software Version Compatible
Reason: CTM - Card Type Mismatch, CAM - CAM ACL Mismatch
SVM - Software Version Mismatch, UE - Unknown Error
Offline Reason: UNP - Unit Not Present, PVE - Port Validation Error
ICE - IPC CP Error, IRE - IPC RP Error
ISE - IPC Setup Error, CVE - Card Validation Error
PE-ID assigned: 200
Status: online
System Mac: f8:b1:56:00:02:8a
PE Up Time: 00:01:25
PE Discovery Status: Provisioned PE
User Configured Cascade Ports: Te 0/22(A),Te 0/23(A)
Cascade LAG: Po 458(Up)
------------------------------------------------------------------------
Stack-id Status Reason Type UnitMac No. of Ports
------------------------------------------------------------------------
2 online - C1048P f8:b1:56:00:02:8a 52
Dell#
The PE comes online after the auto-synch. To get a dual homing setup, refer to Setting up Dual Homing.
Upgrading from OS 9.10(0.0)
To upgrade a dual homing setup with Dell Networking OS 9.10(0.0) to later versions, perform the following steps:
In the following example, C90101 is the primary system and C90102 is secondary. The VLT peers and the PEs in the setup
are upgraded from Dell Networking OS 9.10(0.1) to 9.11(0.0). After the upgrade is completed, the VLT peers exchange the roles.
C90102 becomes the secondary VLT peer and C90101 takes up the secondary role.
1. Upgrade boot partition in secondary VLT peer with new software image.
C9010-2#upgrade system-image all tftp://10.11.8.184/users/dellnetworking/FTOS-
C9000-9.11.0.0.bin B:
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
Port Extenders (PEs)
725