Instructions / Assembly

Step 1.
Determine which corner of the 210 water basin will feature the 211 spillway. In the selected
corner mark a point 1½” down from the top rail and 2” horizontally from the corner, then
drill a 1 1/8” hole with a wood bit or hole saw. This will be the exit for the pump cord.
Step 2.
Remove the nut from the clear bulkhead fitting and slide fitting into the predrilled hole in the
center of the 211 spillway. The flange side is located in the area designed to hold water. On
the backside of the 211 spillway thread the nut onto the bulkhead fitting and hand tighten.
Next thread the barbed adaptor into the back, nut side, of the bulkhead fitting.
Step 3.
Insert and thread the diffuser into the top of the bulkhead fitting.
Step 4.
NoteSkip Step 4 if 211 spillway backside is pre-marked with guide lines.
Set the 211 spillway in the corner of the 210 basin where the hole was drilled in Step 1. Line
up the 211 spillway to have its two outside walls evenly extend 1½” past the top rails of the
210 basin. With a marker trace the 211 spillway’s position on both the backsides of the 211
spillway.
Step 5.
If two people are assembling, turn the 210 basin on its side and have one person hold the 211
spillway in the marked position while the other person secures the 211 spillway in place with
the supplied screws. If only one person is assembling, place the 211 spillway on its backside
and then turnover 210 basin and align top rails to marked position. It will be necessary to lev-
el the opposite end of the 210 basin with a board or other object to assist in assembly. Screws
should be placed in the backside of the 210 rails and extend into the 211 bottom flange. NOTE
Screw locations may be marked from the factory. If so, just locate screws in marked posi-
tions. The first screw should be located in the corner of the 210 rails about 1” in from the exte-
rior rail walls. Evenly space the remaining screws two per wall about 1” in from the exterior
rail wall. NOTE Be careful not to screw into the 211 spillway’s basin area.
Instructions Continued On Back
40210-WF Water Feature
I N S T A L L A T I O N I N S T R U C T I O N S
Parts List
1 ea 210 Water Basin 62”L x 46”W x 16”H 1 ea 211 Spillway 21”L x 21”W x 7”H
1 ea 739-WP 530 GPH Pump 1 ea Tubing 3/4” diameter & 9½” L
1 ea Bulkhead Fitting 1 1/8” diameter 1 ea Diffuser
2 ea Barbed adapters 1 ea Rubber Grommet 1 1/8” diameter
2 ea Hose Clamps 3/4 5 ea Trusshead Screws 3/4” L
Tools Required
Cordless Drill Phillips Screw Driver or Bit
1 1/8” Diameter Drill Bit or Hole Saw Level

Summary of content (2 pages)