Operation Manual

Setup
10
PowerScan™ PD9530/PBT9500/PM9500
To change the Bracket:
1. Remove the screw holding the Bracket in place. Retain the screw for re-
use.
2. Carefully lift off the Bracket.
3. Install the other bracket by first slipping the end tab into place on the
base station, then easing the tabs (shown in Figure 1 on page 9) into
place on the sides.
4. Replace the screw to secure the Bracket to the Base Station.
Figure 2. Changing the Bracket
12
3
Permanent Mounting
For either desktop or wall mounting, the cradle can be fastened directly to a
flat surface using screws (not included).
When mounting on drywall, the base should be screwed to a wall stud or
supporting beam for additional support.
Figure 3. Base Station Bottom
Mounting
Protective Adhesive
Rubber Feet
Rubber Feet
Strips
Holes