Installation Guide

ROUGH-IN INSTALLATION
Installation Instructions For
Pull Stop Box
2. Attach supply line to valve inlet via pipe manufacturer’s recom-
mended practice (i.e. sweat for copper, solvent cement for CPVC,
crimp rings for PEX).
1. Identify desired outlet location.
3. Fasten Pull Stop Box using two screws or two nails into
a stud or thread a hyco strap through the mounting bracket slot
and secure with a screw. (Do not over tighten screws or over
drive nails.)
4. Pull Stop Box arrives in the off position. Once box is securely
attached to wall and the supply line is properly attached, no
further work is necessary during the rough-in phase. The
included protective cover will protect the valve during the
construction process.
TRIM KIT INSTALLATION
1. Remove protective cover by pulling away from wall. 2. Feed a flexible connector through escutcheon. It may be
helpful to first attach supply line to the fixture.