Installation Guide

Peel & Stick Primer / TDS-231
1 Product Name
Peel & Stick Primer
2 Manufacturer
Custom Building Products
Technical Services
10400 Pioneer Boulevard, Unit 3
Santa Fe Springs, CA 90670
Customer Support: 800-272-8786
Technical Services: 800-282-8786
Fax: 800- 200-7765
Email: contactus@cbpmail.net
custombuildingproducts.com
3 Product Description
Peel & Stick Primer is used for the application of peel and stick mat
underlaymentslikeCrackBuster®ProandEasyMat®.Itsealsporous
surfaces and improves the bond of underlayments.
Key Features
Specifically formulated for improved adhesion of peel and stick
membranes such as Crack Buster Pro and EasyMat
Adheres directly to interior concrete, plywood and OSB
Easy to apply - just roll on
Suitable Substrates
Concrete, cement mortar, masonry
Cement Backerboard
Exterior Plywood and OSB (interior, dry areas only)
ExteriorDecks–ContactTechnicalServices
PostTensionConcrete–ContactTechnicalServices
Lightweight Concrete (min. 2000 psi compressive strength)
Gypsum-Based cement topping (min. 2000 psi compressive strength)
Existing ceramic tile and resilient flooring
Limitations to the Product
Do not apply to frozen surfaces or when temperatures drop below
50°F(10°C).
Packaging
1 Gallon (3.78 L) Bottles
4 Technical Data
Applicable Standards
No current standards exist.
Environmental Consideration
Custom®BuildingProductsiscommittedtoenvironmental
responsibility in both products produced and in manufacturing
practices.UseofthisproductmaycontributetoLEED®certification.
5 Instructions
General Surface Prep
USE CHEMICAL-RESISTANT GLOVES, such as nitrile, when
handling product.
Exterior and wet areas must have proper sloping to drains. All surfaces
must be structurally sound, clean, dry and free from contaminants that
would prevent a good bond. Newly prepared concrete must be
troweled smooth and textured to a fine broom finish and cured for 28
days. Existing surfaces must be scarified and leveled, and all defects
must be repaired. Cracks exceeding 1/8" (3 mm) should be treated in
accordance with TCNA F125 or TCNA F125A.
Movement Joint Placement
Do not bridge joints designed to experience movement. Carry these
types of joints through the tile work. Clean the joint and install an open
or closed cell-backer rod to the proper depth, as outlined in the Tile
Council Handbook, EJ171. Next compress sealant into the joint, coating
the sides and leaving the sealant flush with the surface. When the
sealant is dry, place bond-breaker tape over the joint. Install the tile
work onto the membrane, but do not bridge the joint. After the tile
work is properly set, follow the architect's and manufacturer's
instructions to fill the joint with a specified color sealant.
Application of Product
Apply with a paint brush or short-nap roller. Apply a thin, even coat
andallowtodrytoaclearfilmbeforeapplyingCrackBuster®or
EasyMat®underlayments.
Drying Time
Allowtodryuntiltackytothetouch(about30–45minutes).Drying
times may vary depending on air temperature and humidity.
Protection
If tile or stone will not be set immediately after curing, protect the
application from heavy traffic damage. Protect from rain and inclement
weather for 72 hours after application. If delays longer than 72 hours
are expected, cover the area with felt paper. Care should be taken to
prevent the application from becoming soiled or punctured during and
after application.
Cleaning of equipment
Clean tools with soap and water.
Storage
Store in a cool dry area. Keep from freezing.
Peel & Stick Primer
Published Date: 10/12/2016

Summary of content (3 pages)