Charcoal Grill User Manual
8
NOTE TO PLUMBERS AND ELECTRICIANS:
DO NOT install any electrical or plumbing materials affected by elevated temperatures
within 18” of any side of this appliance.
Rotisserie outlet power requirements: 115 v 45 AMP straight blade receptacle.
Centre line of outlet face must be within 30 inches of rotisserie motor mounting slot on
left side of the appliance for the cord set to reach.
NOTE TO MASONS/CARPENTERS/ETC:
Make sure your client has selected suitable materials for the application. Heat resistance
and ability to clean are of primary concern.
The structure must be able to support a minimum of 300 lbs. Metal re-inforcements are
recommended din key support areas (under the cabinet and under upper flange). Be sure
not to impede roll dome operation or removal (if applicable), (see diagrams pages #3 &
4). Be sure not to block the rotisserie motor slot or its ability to be inserted and
removed. Opening dimensions and rotisserie clearances are indicated on page #4.
The broiler should remain removable from the supporting structure. DO NOT grout,
mortar, or trim it into place. Bull-nose style finishing, if any, up to the flange is
recommended. DO NOT fasten the appliance in place.
CROWN VERITY INC., 37 ADAMS BLVD., BRANTFORD, ON. CAN. N3S 7V8
TEL: (519) 751-1800 FAX: (519) 751-1802
www.crownverity.com
Email: info@crownverity.com