Assembly Instruction

Customer Service 800-967-6696 | http://www.crateandbarrel.com
CHECKERS TRIPLE, DOUBLE & SINGLE BASE ASSEMBLY
Made in Taiwan - r04
Page 1 of 1
Thank you for purchasing the Checkers Triple, Double or
Single Base. This page
lists all the contents included in the
box. Please take the time
to identify the hardware as well as
the individual components
to this product. As you unpack
and prepare for assembly, place the contents on a carpeted
or padded area to protect them from damage.
Note: 2 people are required to safely assemble this product.
TOOLS REQUIRED
Missing hardware? Please call 800.606.6387 for replacements.
HARDWARE
Single - 2 screws
Double - 4 screws
Triple - 6 screws
Phillips head screwdriver
1 Fit assembled Checkers shelving unit into base as
shown. Align pilot holes on back edge of shelving unit with
holes in back of base.
Insert 1 screw through each base hole and into shelving unit.
Secure each screw with a phillips head screwdriver, but do
not over tighten.
2 If assembling multiple shelving units into a double or triple
base, be sure to connect the units together with the metal
mending plates (included with the shelving units) at each set
of adjacent pilot holes after attaching to the base.
CLEANING AND CARE
Clean surfaces with a dry or damp soft cloth. Do not
use abrasive cleaners.
Customer Service 800.967.6696 | www.crateandbarrel.com
NOTE: Units are intended to stack
vertically and should not be stacked
more than 5 cubes high.