User's Manual

© 2017 Connected Holdings LLC 7 / 9
3 Test Method
3.1 Hardware
Test Item
Description
Baseband Function Test
Power Input Test
Power Consumption and Current Test
Heat Dissipation Test
UART Stability Test
GPIO Level Test
LED Stability Test
Drop Down Test
ESD Test
High/Low Temperature Test
RF Test
RF Performance Test
GPS Performance Test
Antenna Performance Test
3.2 Software Test
Test Environment Construct
Message Test environment
1. USB dongle and PC as message server
2. Send message to Arrow-L
UART Test environment
1. Connect Arrow-L to pc with com serial cable
2. Open Terminal tool and send at command
3. Response can be shown at terminal window